Blanket Ranch South Solar (ERCOT-24INR0358) — Project Summary

Queue ID
ERCOT-24INR0358
Capacity
101.3 MW
Technology
Solar+Battery
Status
active
Location
Brown, TX
Region
ERCOT
Developer
Blanket Ranch South Solar, LLC
IA Status
Facility Study

Blanket Ranch South Solar

ERCOT-24INR0358BetaActiveSolarBatteryERCOTLBNL

101.3 MW hybrid in Brown, TX · In queue since June 2022 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.3 MW

Capacity

1

Components

Solar

4y 5m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 3m

Facilities Study50%
Queue EntryJun 10, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-22

Queue history
24INR0358 · 43 monthly ERCOT reports, Nov 2022 – May 2026

Projected COD moved

4 times

Sep 2024 → Sep 2028

Net change

+48 months

first report to latest

Capacity

137 → 101 MW

changed in the reports

Latest stage

Cancelled

last listed May 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 10, 2022
CancelledJun 9, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 2028
From queue filing
Developer in saved assessment
Diode Ventures
Filed as Blanket Ranch South Solar, LLC
Status at research time
Active
Active — Facility Study stage per LBNL; Chapter 313 tax abatement approved by Zephyr ISD in 2022, indicating local permitting progress
Financing
Not recorded

Milestones in this assessment

Permit approvedJun 2022

Chapter 313 property value limitation agreement approved by Zephyr ISD, providing tax abatement for 10-year period starting 2028

zephyrisd.net
COD targetSep 2028Latest in this assessment

Proposed commercial operation date per ERCOT interconnection queue filing

interconnection.fyi
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. zephyrisd.net/wp-content/uploads/2022/06/ZEPHYR-ISD-Blanket-Ranch-South-Solar-LLC-CH313-SUMMARY-5-15-2022.pdf
  2. cleanview.co/power-projects/developers/diode-ventures
  3. interconnection.fyi/project/ercot-24inr0358

Commercial operation date: LBNL queue snapshot proposes 2028-09-22 COD. No independent news sources confirm or contradict this date; the Chapter 313 tax filing from 2022 shows value limitation starting in school year 2028-29, consistent with LBNL timeline.

Developer: LBNL filing entity is 'Blanket Ranch South Solar, LLC' (project shell). Cleanview pipeline database attributes this project to Diode Ventures as the operating developer/parent company.

Status: LBNL status is 'active' at Facility Study stage. The 2022 Chapter 313 property tax limitation agreement with Zephyr ISD demonstrates the project secured local tax incentives and is progressing through development milestones.

About

Saved background

Generated Apr 10, 2026 · Predates May 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Blanket Ranch South Solar SLF is a proposed solar generation project located in Brown County, Texas, within the ERCOT region. The project, developed by Blanket Ranch South Solar, LLC, has a total capacity of 134.7 MW. It consists entirely of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0358, with a queue entry date of June 10, 2022. The proposed commercial operation date is September 22, 2028. Its interconnection status is currently in the Facility Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: May 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brown

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blanket Ranch South Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 11441 CORN TRAIL SWITCH - 1444 BROWN SWITCH

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.