Cibeles Solar (ERCOT-24INR0356) — Project Summary

Queue ID
ERCOT-24INR0356
Capacity
252.3 MW
Technology
Solar
Status
active
Location
Mclennan, TX
Region
ERCOT
Developer
Elawan Cibeles Solar, LLC
IA Status
IA Executed

Cibeles Solar

ERCOT-24INR0356BetaActiveSolarERCOTLBNL + Live

252.3 MW generation in Mclennan, TX · In queue since May 2022 · Proposed COD August 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

252.3 MW

Capacity

1

Components

Solar

4y 6m

In Queue

IA Executed

IA Phase

Signed Feb 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 9m

IA → COD

3y 6m

Total Duration

2y 9m

Construction75%
Queue EntryMay 16, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 25, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-08-15

Queue history
24INR0356 · 45 monthly ERCOT reports, Jan 2023 – Sep 2026

Projected COD moved

5 times

Mar 2026 → Aug 2028

Net change

+29 months

first report to latest

Capacity

301 → 252 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 16, 2022
Facilities study approvedNov 14, 2024
Interconnection agreement signedFeb 25, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 30, 2027
Differs from queue: Aug 15, 2028From queue filing
Developer in saved assessment
Elawan Energy
Filed as Elawan Cibeles Solar, LLC
Status at research time
IA Executed
IA Executed — Interconnection Agreement signed with Oncor on 2025-02-25, FERC EWG self-certification filed June 2025
Financing
Not recorded

Milestones in this assessment

IA executedFeb 25, 2025

Standard Generation Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Elawan Cibeles Solar LLC

interchange.puc.texas.gov
Permit approvedJun 3, 2025

FERC Exempt Wholesale Generator self-certification filed (Docket No. EG25-345-000)

govinfo.gov
COD targetJun 30, 2027Latest in this assessment

Project listed in ERCOT MORA with 2027 target COD

ercot.com
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/Documents/54974_312_1504469.PDF
  2. govinfo.gov/content/pkg/FR-2025-06-10/pdf/2025-10483.pdf
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&ItemMatch=Equal&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
  4. ercot.com/files/docs/2026/01/02/MORA_March2026.xlsx
  5. elawan.com/wp-content/uploads/2025/03/ELAWAN_SUSTAINABILITY_REPORT_2022-1-comprimido.pdf
  6. leinumber.com/leicert/529900CK4LWIKWG1KA57/

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-06-30. No independent news sources or press releases found to confirm or contradict this date. ERCOT MORA spreadsheet (Jan 2026) lists project for 2027 but no specific date.

Developer: LBNL filing entity is 'Elawan Cibeles Solar, LLC', a project-specific SPV. Multiple sources (PUC filings, Elawan 2022 Sustainability Report, LEI records) confirm this is a wholly-owned subsidiary of Elawan Energy, the operating parent company based in Houston.

Status: LBNL shows IA executed 2025-02-25. PUC Interchange confirms Standard Generation Interconnection Agreement between Oncor and Elawan Cibeles Solar LLC filed March 2025. FERC EWG self-certification (Docket EG25-345-000) filed June 3, 2025, indicating project advancing toward construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Cibeles Solar project is a proposed 251 MW solar generation facility in McLennan County, Texas. Developed by Elawan Cibeles Solar, LLC, the project consists of 251 MW of solar photovoltaic generation. It is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0356, with a queue entry date of May 16, 2022.

The proposed commercial operation date for Cibeles Solar is June 30, 2027. The project's interconnection status is currently in the Facility Study phase. Recent news coverage has discussed the development project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Mclennan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Elawan Cibeles Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

3379 Tiger Creek Switch (TIGERCREEK_5) 345 kV Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.