Mystic Springs Renewable Energy Storage SLF (ERCOT-24INR0340) — Project Summary

Queue ID
ERCOT-24INR0340
Capacity
—
Technology
Battery
Status
active
Location
Kaufman, TX
Region
ERCOT
Developer
Mystic Spring Renewable Energy LLC
IA Status
—

Mystic Springs Renewable Energy Storage SLF

ERCOT-24INR0340BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

— hybrid in Kaufman, TX · In queue since May 2022 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

—

Capacity

0

Components

4y 5m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 10m

Pre-Study0%
Queue EntryMay 10, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

About

Mystic Springs Renewable Energy Storage SLF is a proposed battery energy storage development project in Kaufman County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Mystic Spring Renewable Energy LLC and is classified as a hybrid project, pairing battery energy storage with a second component listed only as "Other" in the queue data. Total installed capacity and the capacities of the individual components are not specified in the available data.

The project is listed in the ERCOT interconnection queue under queue ID 24INR0340. It entered the queue on May 10, 2022, and its status is active. The proposed point of interconnection is a tap on the 345 kV line between Royse Switch (2478) and Poetry Switch (2485). The developer has proposed a commercial operation date of March 31, 2028. The available data does not specify the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kaufman

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mystic Spring Renewable Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.