St. Gall Solar (ERCOT-24INR0233) — Project Summary

Queue ID
ERCOT-24INR0233
Capacity
207 MW
Technology
Solar
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
St. Gall Solar LLC
IA Status
Facility Study

St. Gall Solar

ERCOT-24INR0233BetaActiveSolarERCOTLBNL

207 MW generation in Pecos, TX · In queue since February 2022 · Proposed COD June 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207 MW

Capacity

1

Components

Solar

4y 9m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Schedule

6 months past proposed COD

Facilities Study50%
Queue EntryFeb 28, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-01

Queue history
24INR0233 · 53 monthly ERCOT reports, Feb 2022 – Jun 2026

Projected COD moved

2 times

Dec 2024 → Jun 2026

Net change

+18 months

first report to latest

Capacity

207 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jun 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 28, 2022
CancelledJul 8, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2y 4m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Project statusOperationalESS News · 2024-07-26

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 2026
From queue filing
Developer in saved assessment
Jupiter Power
Filed as St. Gall Solar LLC
Status at research time
Active
Active — Facility Study stage in ERCOT queue; co-located BESS component (100MW/200MWh) already operational as of July 2024
Financing
Not recorded

Milestones in this assessment

COD targetJul 2024

Co-located 100MW/200MWh St Gall BESS went online near Fort Stockton with Energy Vault technology

ess-news.com
COD targetJun 2026Latest in this assessment

Solar component targeting June 2026 commercial operation per ERCOT queue filing

cleanview.co
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. ess-news.com/2024/07/26/100mw-200mwh-bess-goes-online-in-texas-with-energy-vault-and-jupiter-power/
  2. cleanview.co/power-projects/planned/solar-farms/texas/24INR0233/st-gall-solar
  3. cleanview.co/power-projects/developers/jupiter-power
  4. lei-identifier.com/leicert/254900XHQOT4C1OFMB68/
  5. assets.comptroller.texas.gov/ch313/1895/01895-772-2023-0815-SLA-186902-FortStockton_V1.pdf

Commercial operation date: LBNL queue shows June 2026 COD. No independent news sources confirm or contradict this date. Cleanview aggregator mirrors LBNL data without independent verification.

Developer: LBNL filing entity is 'St. Gall Solar LLC' (project SPV registered in Delaware per LEI data). ESS News July 2024 reports 'Jupiter Power's St Gall BESS has gone online' at same Fort Stockton location, establishing Jupiter Power as the operating parent company.

Status: LBNL shows 'Active' at Facility Study stage for the 207 MW solar component. Jupiter Power's co-located St Gall BESS went online July 2024 per ESS News, indicating site development is underway with storage preceding solar.

About

Saved background

Generated Apr 10, 2026 · Predates Jun 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The St. Gall Solar project is a proposed 207 MW solar generation facility in Pecos County, Texas. The project, developed by St. Gall Solar LLC, is located within the ERCOT region and entered the interconnection queue as ERCOT-24INR0233 on February 28, 2022. The proposed commercial operation date is June 1, 2026, and the project's interconnection status is currently in the Facility Study phase.

The St. Gall Solar project has been the subject of recent news coverage, with six articles appearing in industry and grid-related publications.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jun 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

St. Gall Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

38355 Leon Creek 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LEONLCPCT1_2
POI Substation
Leon Creek Switchyard

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform