Eastbell Milam Solar II (ERCOT-24INR0208) — Project Summary

Queue ID
ERCOT-24INR0208
Capacity
150.6 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Cattlemen Solar Park II LLC
IA Status
IA Executed

Eastbell Milam Solar II

ERCOT-24INR0208BetaActiveSolarERCOTLBNL + Live

150.6 MW generation in Milam, TX · In queue since March 2022 · Proposed COD November 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150.6 MW

Capacity

1

Components

Solar

4y 8m

In Queue

IA Executed

IA Phase

Signed Oct 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

3y 1m

Total Duration

1y 7m

Schedule

1 months past proposed COD

Construction75%
Queue EntryMar 7, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 25, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-11-01

Queue history
24INR0208 · 55 monthly ERCOT reports, Mar 2022 – Sep 2026

Projected COD moved

10 times

Oct 2024 → Nov 2026

Net change

+25 months

first report to latest

Capacity

153 → 151 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 7, 2022
Facilities study approvedFeb 1, 2024
Interconnection agreement signedOct 25, 2023
Approved for energizationSep 13, 2024
Approved for synchronizationNov 20, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Mar 31, 2026
Differs from queue: Nov 1, 2026From queue filing
Developer in saved assessment
Cattlemen Solar Park II LLC
From queue filing
Status at research time
Active
Active — IA executed October 2023, project appears in ERCOT capacity planning documents through 2024-2025
Financing
Not recorded

Milestones in this assessment

Permit approvedSep 2022

Texas Comptroller determination issued for Cattlemen Solar Park II LLC project in Rosebud-Lott ISD

assets.comptroller.texas.gov
IA executedOct 25, 2023Latest in this assessment

Interconnection Agreement executed with Oncor Electric Delivery Company

interchange.puc.texas.gov
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/24INR0208/eastbell-milam-solar-ii
  2. ercot.com/files/docs/2024/11/01/MORA_January2025.xlsx
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  4. assets.comptroller.texas.gov/ch313/1754/1754-rosebud-cattlemen-cert-CORRECTED.pdf
  5. ercotqueue.com/project/24INR0208

Commercial operation date: LBNL queue shows proposed COD of 2026-03-31. ERCOT capacity charts from 2024 list the project with a 2024 target, but no press releases or developer announcements confirm current timeline. Defaulting to LBNL filing date absent stronger contradictory evidence.

Developer: All sources consistently identify Cattlemen Solar Park II LLC as the developer. No parent company or operating entity identified in search results. This appears to be a project-specific LLC with no public disclosure of ultimate ownership.

Status: LBNL shows 'active' status with IA executed 2023-10-25. ERCOT monthly outlook and capacity documents from 2024 continue to list the project, confirming it remains in active development with no withdrawal signals.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Eastbell Milam Solar II is a proposed solar generation project located in Milam County, Texas, with a total capacity of 150.6 MW. The developer is Cattlemen Solar Park II LLC. The project is interconnected within the ERCOT region and carries the queue ID ERCOT-24INR0208. It entered the interconnection queue on March 7, 2022, and has a proposed commercial operation date of November 27, 2025.

The project's Interconnection Agreement (IA) has been executed as of October 25, 2023. The point of interconnection (POI) is the 345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Cattlemen Solar Park II LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.