Tehuacana Creek Solar (ERCOT-24INR0188) — Project Summary

Queue ID
ERCOT-24INR0188
Capacity
505.43 MW
Technology
Solar+Battery
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
Tehuacana Creek Solar LLC
IA Status
IA Executed

Tehuacana Creek Solar

ERCOT-24INR0188BetaActiveSolarBatteryERCOTLBNL + Live

505.43 MW hybrid in Navarro, TX · In queue since December 2021 · Proposed COD May 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

505.43 MW

Capacity

1

Components

Solar

4y 11m

In Queue

IA Executed

IA Phase

Signed Nov 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 11m

IA → COD

2y 6m

Total Duration

2y 11m

Construction75%
Queue EntryDec 20, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 25, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-05-18

Queue history
24INR0188 · 57 monthly ERCOT reports, Dec 2021 – Sep 2026

Projected COD moved

7 times

Jun 2024 → May 2027

Net change

+35 months

first report to latest

Capacity

700 → 505 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 20, 2021
Facilities study approvedJun 16, 2026
Interconnection agreement signedNov 25, 2024
On ERCOT's inactive listJan 2025 – Jan 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 18, 2027
From queue filing
Developer in saved assessment
Parliament Energy
Filed as Tehuacana Creek Solar LLC
Status at research time
Construction
LBNL shows Active with IA executed 2024-11-25. EIA-based data (Infrasure) lists the plant as under construction, though GEM listed it as pre-construction in Feb 2026. Parliament has since signed a 1.2 GWac tracker supply deal and closed financing.
Financing
Secured
Parliament Energy closed USD 747m in financing for a Texas solar project (Renewables Now, ~3 months ago). The snippet does not name Tehuacana Creek explicitly, so the link to this project is inferred from the search match and Parliament's Texas portfolio.
Research sources and reasoning (8 recorded sources)

medium confidence at research time

  1. renewablesnow.com/news/parliament-energy-secures-usd-747m-in-financing-for-texas-solar-project-1297143/
  2. pv-magazine-usa.com/2026/04/14/ideematec-to-supply-1-2-gw-of-trackers-for-texas-solar-portfolio/
  3. parliamentenergy.com/tehuacana-creek
  4. infrasure.ai/plant/65855-tehuacana-creek-1-solar-and-bess
  5. cleanview.co/power-projects/planned/solar-farms/texas/65855_TE1PV/tehuacana-creek-solar
  6. cleanview.co/power-projects/planned/battery-storage-projects/texas/65855_TE1BS/tehuacana-creek-solar
  7. gem.wiki/Tehuacana_Creek_Solar
  8. msn.com/en-us/money/markets/one-texas-project-tehuacana-creek-1-is-2026-s-biggest-us-solar-build-at-837-mw-plus-418-mw-of-co-located-battery-storage/ar-AA24PFkp

Commercial operation date: Cleanview lists the solar component as 'Expected online 2027', which matches the LBNL proposed COD of 2027-05-18. The battery is listed for 2026, and an MSN headline calls the project one of 2026's biggest builds, so some phasing may come earlier. No source gives a firm date that contradicts LBNL by 1 year or more.

Developer: Parliament Energy's own project page presents Tehuacana Creek (650 MWdc / 505 MWac, Navarro and Freestone counties) as its project. Infrasure lists the operator as Parliament Energy Holdings LLC, so the LBNL LLC is the project shell. Parliament was established by EnCap Energy Transition Fund II and Mercuria.

Status: The LBNL queue state is Active with an executed IA. Later sources (EIA 860M via Infrasure, a financing close, tracker procurement) point to construction, with only the earlier GEM entry saying pre-construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Tehuacana Creek Solar SLF project is a proposed 505.5 MW solar generation project located in Navarro County, Texas. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0188, with a queue entry date of December 20, 2021. The proposed commercial operation date is March 10, 2027.

The project has an Interconnection Agreement (IA) date of November 25, 2024. The developer is not specified in the available data. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Tehuacana Creek Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 3381 Big Brown – 68091 Navarro circuit

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.