Tejano Storage
152.31 MW storage in Victoria, TX · In queue since March 2022 · Proposed COD July 2029
152.31 MW
Capacity
1
Components
Battery
4y 8m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-01
Projected COD moved
3 times
Jun 2025 → Jul 2029
Net change
+49 months
first report to latest
Capacity
152 → 152 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
IA date added March 27, 2025 per Interconnection.fyi newsletter
interconnectionfyi.substack.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- sec.gov/Archives/edgar/data/1004315/000100431523000012/R81.htm
- nationalgrid.com/document/152081/download
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
- ercotqueue.com/project/24INR0168
Commercial operation date: LBNL queue snapshot shows July 2029 COD. No press releases or news articles found announcing financing, construction start, or updated timeline. Cleanview and interconnection.fyi aggregators simply mirror the LBNL queue data.
Developer: LBNL filing entity is 'Tejano Storage, LLC'. SEC filing (Result 6) and National Grid financial statements (Result 9) list 'Tejano Storage, LLC' as a subsidiary of National Grid, indicating the project-LLC is owned by National Grid's renewables development arm.
Status: LBNL shows 'active' status at Facility Study stage. No news coverage of project milestones, permitting, or financing. Ercotqueue.com notes 'No IA' and assigns low build-chance (5%), suggesting early-stage development with no near-term construction signals.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Tejano Storage, LLC is proposing a 152 MW battery storage project called Tejano Storage in Victoria County, Texas. The project is located within the ERCOT region and entered the ERCOT interconnection queue as entry ERCOT-24INR0168 on March 30, 2022. The proposed commercial operation date is July 1, 2029. The project's interconnection agreement status is currently in the Facility Study phase.
The proposed project consists of 152 MW of battery storage capacity. Recent news coverage indicates industry interest in the Tejano Storage development.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Victoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Tejano Storage, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 8125 Lolita - 8172 Victoria
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Lolita Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.