Eagle Springs Storage (ERCOT-24INR0136) — Project Summary

Queue ID
ERCOT-24INR0136
Capacity
33.14 MW
Technology
Solar+Battery
Status
active
Location
Delta, TX
Region
ERCOT
Developer
Eagle Springs Solar, LLC
IA Status
IA Executed

Eagle Springs Storage

ERCOT-24INR0136BetaActiveBatteryBatteryERCOTLBNL + Live

33.14 MW generation in Delta, TX · In queue since October 2021 · Proposed COD March 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

33.14 MW

Capacity

1

Components

Battery

5y 1m

In Queue

IA Executed

IA Phase

Signed Apr 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 6m

IA → COD

2y 11m

Total Duration

2y 6m

Construction75%
Queue EntryOct 18, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 17, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-03-29

Queue history
24INR0136 · 52 monthly ERCOT reports, Jun 2022 – Sep 2026

Projected COD moved

6 times

Dec 2024 → Mar 2027

Net change

+27 months

first report to latest

Capacity

61 → 34 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 18, 2021
Facilities study approvedSep 17, 2025
Interconnection agreement signedApr 17, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonegroundbreakingPV Tech · 2026-03-24
Expected CODQ4 2026PV Tech · 2026-03-24

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Eagle Springs Storage is a proposed 55.1 MW battery storage project located in Delta County, Texas. The project, developed by Eagle Springs Solar, LLC, is currently in the ERCOT interconnection queue as entry ERCOT-24INR0136, with a queue entry date of October 18, 2021. The proposed commercial operation date is December 31, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.

The Eagle Springs Storage project has been featured in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Delta

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Eagle Springs Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line

Data Source

LBNL + Live

DeveloperSunraycer RenewablesPV Tech · 2026-03-24
EPC contractorMcCarthy Building CompaniesPV Tech · 2026-03-24
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SCES_UNIT1
POI Substation
Lake Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26