Desna BESS (ERCOT-24INR0128) — Project Summary

Queue ID
ERCOT-24INR0128
Capacity
205.46 MW
Technology
Battery
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
BRP Desna BESS LLC
IA Status
IA Executed

Desna BESS

ERCOT-24INR0128BetaActiveBatteryERCOTLBNL

205.46 MW storage in Brazoria, TX · In queue since December 2021 · Proposed COD May 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.46 MW

Capacity

1

Components

Battery

4y 11m

In Queue

IA Executed

IA Phase

Signed Sep 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 9m

IA → COD

2y 8m

Total Duration

1y 9m

Schedule

6 months past proposed COD

Construction75%
Queue EntryDec 15, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 15, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-05-31

Queue history
24INR0128 · 54 monthly ERCOT reports, Dec 2021 – May 2026

Projected COD moved

8 times

Mar 2023 → Jul 2026

Net change

+40 months

first report to latest

Capacity

205 → 205 MW

changed in the reports

Latest stage

Commercial operation

last listed May 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 15, 2021
Facilities study approvedAug 1, 2024
Interconnection agreement signedSep 15, 2023
Approved for energizationFeb 2, 2026
Approved for synchronizationMar 23, 2026
Approved for commercial operationJun 23, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jul 2026
Differs from queue: May 31, 2026From queue filing
Developer in saved assessment
Balanced Rock Power
Ownership change in saved research
Status at research time
IA Executed
IA Executed — project acquired by GridStor in Feb 2025, targeting 2026 COD
Financing
Not recorded
Ownership history
  1. 2025-02·Balanced Rock Power (BRP)→GridStorenergy-storage.news

Milestones in this assessment

IA executedSep 15, 2023

Interconnection Agreement executed between BRP Desna BESS LLC and TNMP

interchange.puc.texas.gov
Ownership changeFeb 2025

GridStor acquired 150MW/300MWh Brazoria County BESS project from Balanced Rock Power

energy-storage.news
COD targetJul 2026Latest in this assessment

ERCOT capacity charts show 2026 target COD for Desna BESS

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. energy-storage.news/gridstor-acquires-150mw-300mwh-texas-bess-from-brp/
  2. interchange.puc.texas.gov/Documents/35077_1886_1415794.PDF
  3. ercot.com/files/docs/2024/06/06/Capacity-Changes-by-Fuel-Type-Charts_May_2024_PlannedMonthly.xlsx
  4. public-inspection.federalregister.gov/2024-20764.pdf?1726145126

Commercial operation date: LBNL queue shows proposed COD of 2026-07-31. ERCOT capacity charts from May and June 2024 confirm 2026 target (one shows 2025, likely a typo). No press releases or news articles provide a more recent developer-announced target.

Developer: LBNL filing entity is 'BRP Desna BESS LLC' (shell LLC). Energy-Storage.News Feb 2025 reports GridStor acquired a 150MW/300MWh Texas BESS from Balanced Rock Power (BRP). While capacity differs slightly (150MW vs 205MW in queue), Brazoria location and BRP ownership match, indicating this project was sold to GridStor.

Status: LBNL shows IA executed 2023-09-15 and status active. GridStor acquisition in Feb 2025 suggests project remains on track for development under new ownership.

About

Saved background

Generated Apr 10, 2026 · Predates May 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Desna BESS project is a proposed 205.46 MW battery storage project located in Brazoria County, Texas. Developed by BRP Desna BESS LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-24INR0128. The project entered the interconnection queue on December 15, 2021, and has a proposed commercial operation date of May 6, 2026.

The project's Interconnection Agreement (IA) has been executed as of September 15, 2023. The Desna BESS project is linked to the existing Desna operating plant (EIA ID 65876). The point of interconnection is the 39703 TNP FM524 138kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: May 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BRP Desna BESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

39703 TNP FM524 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
HIGH
Nearest Node (Estimated)
SCLP_PUN1
POI Substation
FM 524 Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.