PHOTO BESS 2 (ERCOT-24INR0122) — Project Summary

Queue ID
ERCOT-24INR0122
Capacity
150 MW
Technology
Solar+Battery
Status
withdrawn
Location
Uvalde, TX
Region
ERCOT
Developer
CED Development Inc.
IA Status
Facility Study

PHOTO BESS 2

ERCOT-24INR0122BetaWithdrawnBatteryBatteryERCOTLBNL + Live

150 MW generation in Uvalde, TX · In queue since October 2021 · Proposed COD September 2027

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

150 MW

Capacity

1

Components

Battery

5y 1m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 11m

Queue EntryOct 29, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2027-09-01

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
24INR0122 · 52 monthly ERCOT reports, May 2022 – Aug 2026

Projected COD moved

3 times

Dec 2024 → Sep 2027

Net change

+33 months

first report to latest

Capacity

150 MW

unchanged in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 29, 2021
CancelledSep 14, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 1, 2027
From queue filing
Developer in saved assessment
CED Development Inc.
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL queue, no public announcements of construction or financing progress
Financing
Not recorded

Milestones in this assessment

IA executedOct 29, 2021Latest in this assessment

Queue entry date in ERCOT, Facility Study started, no IA executed as of May 2024

modo-content-service-prod.s3.amazonaws.com
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
  2. interconnection.fyi/projects/state/TX/uvalde-county

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-09-01. No news articles or press releases found that specifically mention PHOTO BESS 2 or provide updated timeline information. Search results returned generic Texas BESS news but no project-specific updates.

Developer: LBNL lists CED Development Inc. as developer. No news coverage found to confirm or contradict this, and no evidence of shell LLC structure or ownership changes. CED Development Inc. appears to be the actual operating entity based on ERCOT buildout pipeline reference.

Status: LBNL shows 'active' status at Facility Study stage with no IA executed. No news coverage found indicating project advancement, withdrawal, or construction activity.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

PHOTO BESS 2 is a proposed 150 MW battery storage project located in Uvalde County, Texas. The project, developed by CED Development Inc., is interconnected within the ERCOT region and entered the interconnection queue as ERCOT-24INR0122 on October 29, 2021. The proposed commercial operation date is September 1, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The development project consists of 150 MW of battery storage capacity. Recent news coverage indicates regulatory interest in the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Uvalde

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CED Development Inc.

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5885 Downie 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HELIOS_RN
POI Substation
Downie Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about PHOTO BESS 2
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.