Possum Kingdom Solar
262.22 MW hybrid in Jack, TX · In queue since September 2021 · Proposed COD June 2028
262.22 MW
Capacity
1
Components
Solar
5y 2m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-21
Projected COD moved
4 times
Nov 2024 → Jun 2028
Net change
+43 months
first report to latest
Capacity
260 → 262 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Standard Generation Interconnection Agreement filed with Texas PUC between ONCOR and PK Solar, LLC
interchange.puc.texas.govResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/search/filings/?ControlNumber=35077&ItemMatch=0&SortBy=FileStamp&SortOrder=Descending&Page=1
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- comptroller.texas.gov/economy/docs/active-list.xlsx
Commercial operation date: Only LBNL queue snapshot provides a COD target of 2027-10-29. No press releases or news articles with updated COD targets were found in search results.
Developer: LBNL filing entity is 'PK Solar, LLC' (project shell). Texas Comptroller active agreements list shows 'Novis Renewables; f/k/a Possum Kingdom Solar' indicating Novis Renewables is the parent/operating company. LBL hybrid tracking workbook also lists developer as 'Novis Renewables'.
Status: LBNL shows 'active' status at Facility Study stage. Texas PUC Interchange shows Standard Generation Interconnection Agreement filing between ONCOR and PK Solar, LLC dated 8/26/2025, confirming active progression through interconnection process.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Possum Kingdom Solar is a proposed solar generation project located in Jack County, Texas, with a total capacity of 262.22 MW. The project, being developed by PK Solar, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0118, with a queue entry date of September 13, 2021. The proposed commercial operation date is October 29, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection (POI) for Possum Kingdom Solar is Tap 345kV 1421 Willow Creek Switch _x0013_ 11523 Thomas Price. The development has appeared in recent news coverage regarding renewable energy projects in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jack
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
PK Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 1421 Willow Creek Switch – 11523 Thomas Price
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Possum Kingdom Solar
Data-driven briefing on Possum Kingdom Solar — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.