Utley Solar (ERCOT-24INR0117) — Project Summary

Queue ID
ERCOT-24INR0117
Capacity
221.78 MW
Technology
Solar
Status
active
Location
Freestone, TX
Region
ERCOT
Developer
—
IA Status
—

Utley Solar

ERCOT-24INR0117BetaActiveSolarERCOTLBNL + Live

221.78 MW generation in Freestone, TX · In queue since September 2021 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

221.78 MW

Capacity

1

Components

Solar

5y 2m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 8m

Pre-Study0%
Queue EntrySep 6, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-11

Queue history
24INR0117 · 54 monthly ERCOT reports, Mar 2022 – Sep 2026

Projected COD moved

4 times

Apr 2024 → May 2028

Net change

+49 months

first report to latest

Capacity

224 → 222 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 7, 2021
Interconnection agreement signedDec 18, 2025
On ERCOT's inactive listDec 2025 – Dec 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 11, 2028
From queue filing
Developer in saved assessment
Palmera Solar Development
From queue filing
Status at research time
IA Executed
IA Executed — Interconnection Agreement with Oncor signed December 18, 2025; Facility Study pending as of early 2026
Financing
Not recorded

Milestones in this assessment

IA executedDec 18, 2025Latest in this assessment

Standard Generation Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Palmera Solar Development, LLC

interchange.puc.texas.gov
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/Documents/35077_2368_1575687.PDF
  2. renewablesinfo.org/project/ercot-24inr0117-utley-solar
  3. ercot.com/files/docs/2026/02/05/Capacity-Changes-by-Fuel-Type-Charts_January_2026.xlsx
  4. ercotqueue.com/developer/palmera-solar-development-llc

Commercial operation date: LBNL queue shows 2028-05-11 COD. ERCOT capacity chart (Feb 2026) confirms 2028 target. No press releases or news articles with updated developer guidance found.

Developer: PUC Interchange filings (Dec 2025, Jan 2026) identify 'Palmera Solar Development, LLC' as the interconnection agreement party with Oncor. No parent company or operating entity identified in available sources.

Status: PUC Interchange document dated Jan 16, 2026 references executed Interconnection Agreement dated December 18, 2025. Renewablesinfo.org shows IA Status as 'Facility Study' indicating post-IA study phase.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Utley Solar project is a 221.78 MW solar generation facility in Freestone County, Texas. Developed by Palmera Solar Development LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-24INR0117, with a queue entry date of September 7, 2021. The proposed commercial operation date is May 11, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The point of interconnection for Utley Solar is Tap 345kV 3381 Big Brown Switch - 3391 Jewett. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Freestone

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.