Oriana BESS (ERCOT-24INR0109) — Project Summary

Queue ID
ERCOT-24INR0109
Capacity
60.3 MW
Technology
Solar+Battery
Status
suspended
Location
Victoria, TX
Region
ERCOT
Developer
Oriana Solar LLC
IA Status
IA Executed

Oriana BESS

ERCOT-24INR0109BetaSuspendedBatteryBatteryERCOTLBNL + Live

60.3 MW generation in Victoria, TX · In queue since August 2021 · Proposed COD October 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

60.3 MW

Capacity

1

Components

Battery

5y 3m

In Queue

IA Executed

IA Phase

Signed Feb 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 6m

IA → COD

5y 8m

Total Duration

1y 6m

Suspended75%
Queue EntryAug 25, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 27, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-10-30

Queue history
24INR0109 · 49 monthly ERCOT reports, Feb 2022 – Feb 2026

Projected COD moved

4 times

Mar 2024 → Oct 2028

Net change

+55 months

first report to latest

Capacity

61 → 60 MW

changed in the reports

Latest stage

IA signed

last listed Feb 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 25, 2021
Facilities study approvedSep 19, 2022
Interconnection agreement signedFeb 27, 2023
On ERCOT's inactive listMar 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Oriana BESS (ERCOT queue ID 24INR0109) is a proposed energy development project in Victoria County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Oriana Solar LLC is developing the project, which has a total capacity of 60.3 MW. Although the queue classifies it as a Solar+Battery generation project, its only listed component is a 60.3 MW battery energy storage system. The project would connect to the grid at a tap on the 138 kV line between the Rayburn (5502) and Vanderbilt (5584) substations.

The project entered the ERCOT interconnection queue on August 25, 2021. An interconnection agreement was executed on February 27, 2023. Its proposed commercial operation date is October 30, 2028. The project's queue status is currently listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Feb 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Oriana Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 5502 Rayburn - 5584 Vanderbilt

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
ORIANA_RN
POI Substation
Highlands Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.