Opuntia Solar SLF
102.04 MW hybrid in Refugio, TX · In queue since August 2021 · Proposed COD March 2028
102.04 MW
Capacity
1
Components
Solar
5y 3m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-10
Projected COD moved
3 times
Jul 2024 → Mar 2028
Net change
+44 months
first report to latest
Capacity
102 MW
unchanged in the reports
Latest stage
Cancelled
last listed Jan 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Project listed among ERCOT cancellations for February 2026
facebook.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- interconnection.fyi/project/ercot-24inr0103
- facebook.com/groups/erathcountystopsolarfarmshere/posts/1850559615653718/
- eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
- renewablesinfo.org/project/ercot-24inr0103-opuntia-solar-slf
Commercial operation date: Only LBNL queue data provides a COD target of 2028-03-10. No independent news sources or press releases confirm or update this date.
Developer: LBNL lists 'Opuntia Solar, LLC' as developer. No news coverage identifies a parent company or operating entity distinct from this filing name. Appears to be project-specific LLC with no public parent disclosed.
Status: Multiple aggregator sites (interconnection.fyi, renewablesinfo.org) now list status as 'Withdrawn' despite LBNL showing 'active'. Facebook post from Feb 2026 lists project among ERCOT cancellations for that month.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Opuntia Solar SLF is a proposed solar generation project with a total capacity of 102.04 MW. The project, located in Refugio County, Texas, is being developed by Opuntia Solar, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0103, with a queue entry date of August 24, 2021.
The proposed commercial operation date for Opuntia Solar SLF is March 10, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is tap 138kV 5607 Warburton - 8912 Medio Creek.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jan 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Refugio
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Opuntia Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 138kV 5607 Warburton - 8912 Medio Creek
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Warburton Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.