Opuntia Solar SLF (ERCOT-24INR0103) — Project Summary

Queue ID
ERCOT-24INR0103
Capacity
102.04 MW
Technology
Solar+Battery
Status
active
Location
Refugio, TX
Region
ERCOT
Developer
Opuntia Solar, LLC
IA Status
Facility Study

Opuntia Solar SLF

ERCOT-24INR0103BetaActiveSolarBatteryERCOTLBNL

102.04 MW hybrid in Refugio, TX · In queue since August 2021 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

102.04 MW

Capacity

1

Components

Solar

5y 3m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 7m

Facilities Study50%
Queue EntryAug 24, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-10

Queue history
24INR0103 · 54 monthly ERCOT reports, Aug 2021 – Jan 2026

Projected COD moved

3 times

Jul 2024 → Mar 2028

Net change

+44 months

first report to latest

Capacity

102 MW

unchanged in the reports

Latest stage

Cancelled

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 24, 2021
CancelledFeb 24, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 10, 2028
From queue filing
Developer in saved assessment
Opuntia Solar, LLC
From queue filing
Status at research time
Withdrawn
Withdrawn — interconnection.fyi tracking shows project status changed from Active to Withdrawn after LBNL snapshot
Financing
Not recorded

Milestones in this assessment

WithdrawnFeb 2026Latest in this assessment

Project listed among ERCOT cancellations for February 2026

facebook.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-24inr0103
  2. facebook.com/groups/erathcountystopsolarfarmshere/posts/1850559615653718/
  3. eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
  4. renewablesinfo.org/project/ercot-24inr0103-opuntia-solar-slf

Commercial operation date: Only LBNL queue data provides a COD target of 2028-03-10. No independent news sources or press releases confirm or update this date.

Developer: LBNL lists 'Opuntia Solar, LLC' as developer. No news coverage identifies a parent company or operating entity distinct from this filing name. Appears to be project-specific LLC with no public parent disclosed.

Status: Multiple aggregator sites (interconnection.fyi, renewablesinfo.org) now list status as 'Withdrawn' despite LBNL showing 'active'. Facebook post from Feb 2026 lists project among ERCOT cancellations for that month.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Opuntia Solar SLF is a proposed solar generation project with a total capacity of 102.04 MW. The project, located in Refugio County, Texas, is being developed by Opuntia Solar, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-24INR0103, with a queue entry date of August 24, 2021.

The proposed commercial operation date for Opuntia Solar SLF is March 10, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is tap 138kV 5607 Warburton - 8912 Medio Creek.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Refugio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Opuntia Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 5607 Warburton - 8912 Medio Creek

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Warburton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.