Lampe Solar
60.24 MW generation in Washington, TX · In queue since August 2021 · Proposed COD December 2027
60.24 MW
Capacity
1
Components
Solar
4y 11m
In Queue
Facility Study
IA Phase
COD target: 2027
Total Duration
6y 4m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-26
The proposed Lampe Solar project is a 60.24 MW solar generation facility located in Washington County, Texas. Developed by Gransolar Texas Seven LLC, the project consists of 60.24 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0101, with a queue entry date of August 3, 2021, and a proposed commercial operation date of December 26, 2027. The project's interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Lampe Solar operating plant (EIA ID 67781). Recent news coverage has discussed the project in the context of industry developments.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Washington
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Gransolar Texas Seven LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138 kV 7572 Gay Hill - 7573 Lyons
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- MEDIUM
- POI Substation
- Gay Hill Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Lampe SolarForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.