Pisgah Ridge Solar 2 (ERCOT-24INR0086) — Project Summary

Queue ID
ERCOT-24INR0086
Capacity
101.89 MW
Technology
Solar+Battery
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
Pisgah Ridge Solar 2, LLC
IA Status
Facility Study

Pisgah Ridge Solar 2

ERCOT-24INR0086BetaActiveSolarBatteryERCOTLBNL + Live

101.89 MW hybrid in Navarro, TX · In queue since July 2021 · Proposed COD March 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.89 MW

Capacity

1

Components

Solar

5y 4m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 8m

Facilities Study50%
Queue EntryJul 14, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

Queue history
24INR0086 · 61 monthly ERCOT reports, Sep 2021 – Sep 2026

Projected COD moved

5 times

Sep 2024 → Mar 2029

Net change

+54 months

first report to latest

Capacity

102 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 14, 2021
Facilities study approvedSep 1, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 2y 3m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · 2023-03Power Technology · 2024-08-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Mar 2023
Differs from queue: Mar 31, 2029
Developer in saved assessment
Deriva Energy (formerly Duke Energy Renewables)
Ownership change in saved research
Status at research time
Active
Active — Phase 1 (250MW) operational since March 2023; Phase 2 (102MW) remains in Facility Study stage per LBNL
Financing
Secured
Deriva Energy announced $127M financing completion in May 2025 for solar and wind portfolio (specific project allocation not disclosed)
Ownership history
  1. 2025-05·Duke Energy Renewables→Deriva Energy (Brookfield portfolio company)mercomcapital.com

Milestones in this assessment

GroundbreakingJun 2021

Duke unit starts construction on 250MW Pisgah Ridge project with PPAs secured

pv-magazine-usa.com
COD targetMar 2023

250MW Pisgah Ridge solar project now operating, selling power to three corporate offtakers

bizjournals.com
Ownership changeMay 2025

Duke Energy Renewables rebranded to Deriva Energy under Brookfield ownership

mercomcapital.com
Financing closeMay 2025Latest in this assessment

Deriva Energy completes $127M financing for solar and wind portfolio

mercomcapital.com
Research sources and reasoning (7 recorded sources)

high confidence at research time

  1. power-technology.com/projects/pisgah-ridge-solar-project-texas-us/
  2. pv-magazine-usa.com/2022/03/03/duke-energy-250mw-solar-project-finds-offtaker-in-major-us-retailer/
  3. bizjournals.com/charlotte/news/2023/03/08/duke-energy-sustainable-solutions-solar-texas.html
  4. mercomcapital.com/deriva-energy-secures-127-m-financing-solar-and-wind-projects/
  5. pv-magazine-usa.com/2021/06/07/sunrise-brief-with-ppas-in-hand-duke-unit-starts-work-on-250-mw-texas-solar-project/
  6. cleanview.co/power-projects/planned/solar-farms/texas/24INR0086/pisgah-ridge-solar-2
  7. comptroller.texas.gov/economy/docs/active-list.xlsx

Commercial operation date: The Business Journals (March 2023) reports the 250MW Pisgah Ridge solar project is 'now operating in Texas.' LBNL's 2029 COD for the 102MW 'Pisgah Ridge Solar 2' appears to be a separate phase or expansion, but the main project is already online, making the 2029 date likely stale or referring to a different component.

Developer: Power Technology and pv magazine (2021-2022) identify Duke Energy Sustainable Solutions as developer. Mercom Capital (May 2025) reports Duke Energy Renewables rebranded to Deriva Energy and is now a Brookfield portfolio company. The LBNL filing entity is a project LLC.

Status: LBNL status 'active' is accurate for this queue position. The 250MW main project is operational (March 2023), but this 102MW component appears to be a separate phase still in interconnection studies.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Pisgah Ridge Solar 2 is a proposed solar generation project located in Navarro County, Texas, within the ERCOT region. The project, developed by Pisgah Ridge Solar 2, LLC, has a total capacity of 101.89 MW. It consists solely of solar photovoltaic generation.

The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0086, with an original queue entry date of July 14, 2021. The proposed commercial operation date is December 1, 2028. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345kV 68091 Navarro - 46020 Limestone. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Pisgah Ridge Solar 2, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 68091 Navarro - 46020 Limestone

Data Source

LBNL + Live

DeveloperDeriva Energy±Mercom Capital Group · 2025-05-22
EPC contractorMoss & AssociatesPower Technology · 2024-08-30
TransactionDebt financingMercom Capital Group · 2025-05-22
Deal value$127.0MMercom Capital Group · 2025-05-22
LenderPrincipal Asset Management and MetLife Investment ManagementMercom Capital Group · 2025-05-22
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Navarro Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-03-26

View all articles

No Ask reports yet for this entity.

Ask about Pisgah Ridge Solar 2
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.