Briggs Storage (ERCOT-24INR0058) — Project Summary

Queue ID
ERCOT-24INR0058
Capacity
336 MW
Technology
Solar+Battery
Status
active
Location
Haskell, TX
Region
ERCOT
Developer
IP Quantum III, LLC
IA Status
IA Executed

Briggs Storage

ERCOT-24INR0058BetaActiveBatteryBatteryERCOTLBNL + Live

336 MW generation in Haskell, TX · In queue since May 2021 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

336 MW

Capacity

1

Components

Battery

5y 6m

In Queue

IA Executed

IA Phase

Signed Mar 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 10m

IA → COD

3y 1m

Total Duration

3y 10m

Construction75%
Queue EntryMay 31, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementMar 15, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-04-15

Queue history
24INR0058 · 55 monthly ERCOT reports, Mar 2022 – Sep 2026

Projected COD moved

2 times

Dec 2024 → Apr 2028

Net change

+40 months

first report to latest

Capacity

73 → 336 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 31, 2021
Interconnection agreement signedMar 15, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 15, 2028
From queue filing
Developer in saved assessment
IP Quantum III, LLC
From queue filing
Status at research time
IA Executed
Active in the ERCOT queue with an executed interconnection agreement. A first amended and restated SGIA with Electric Transmission Texas covering Briggs Solar and Briggs Storage was filed at the Texas PUC in Aug 2025. ercotqueue.com notes FIS is still pending. No construction start found.
Financing
Not recorded

Milestones in this assessment

IA executedAug 25, 2025Latest in this assessment

First Amended and Restated ERCOT SGIA between Electric Transmission Texas, LLC and IP Quantum III, LLC (Briggs Solar and Briggs Storage) filed at Texas PUC.

interchange.puc.texas.gov
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. interconnection.fyi/project/ercot-24inr0058
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/24INR0058/briggs-storage
  3. ercotqueue.com/project/24INR0058
  4. ercotqueue.com/developer/ip-quantum-iii-llc
  5. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=2235

Commercial operation date: LBNL proposed COD is 2028-04-15. Cleanview lists 'Expected online 2028' and interconnection.fyi shows 'April 15, 2028', but both appear to mirror the ERCOT queue data. No developer press release or financing-backed date was found to override it.

Developer: ercotqueue.com, interconnection.fyi and the Texas PUC SGIA filing all name IP Quantum III, LLC. No source identifies a parent or operating company. Infrasure and Cleanview list 'Briggs Solar, LLC', but that appears to be a separate ~71 MW record, so I did not treat it as the developer of this 336 MW project.

Status: LBNL shows status active, IA Executed (IA date 2025-03-15). The Texas PUC filing corroborates an executed, amended SGIA. interxdata's 'operational' label conflicts with all other sources and was disregarded as an aggregator error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Briggs Storage is a proposed 70.39 MW battery storage project in Haskell County, Texas. The project, developed by Briggs Solar, LLC, is located within the ERCOT region and consists entirely of battery storage. It is listed in the ERCOT interconnection queue as entry ERCOT-24INR0058, with a queue entry date of May 31, 2021, and a proposed commercial operation date of April 15, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project's point of interconnection (POI) is on the tap 345kV 60515 Clear Crossing - 60507 Pendulo line. Briggs Storage has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Haskell

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

IP Quantum III, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 60515 Clear Crossing - 60507 Pendulo

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.