Rosebud Solar SLF
130 MW hybrid in Falls, TX · In queue since April 2021 · Proposed COD January 2028
130 MW
Capacity
1
Components
Solar
5y 7m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-15
Projected COD moved
2 times
Feb 2024 → Jan 2028
Net change
+47 months
first report to latest
Capacity
113 → 130 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
No IA executed — project remains at Facility Study stage as of latest ERCOT GIS report
ercotqueue.comResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-24inr0040
- ercotqueue.com/project/24INR0040
- ercotqueue.com/developer/rosebud-solar-llc
- cleanview.co/power-projects/planned/solar-farms/texas/24INR0040/rosebud-solar-slf
Commercial operation date: Only LBNL queue data provides a COD target of 2028-01-15. No news articles, press releases, or developer announcements found to validate or update this date.
Developer: LBNL filing entity is 'Rosebud Solar, LLC' with no evidence of a parent company or shell-LLC structure. No news coverage identifies an operating parent or ownership changes.
Status: LBNL reports 'active' status at Facility Study stage with no IA date. Third-party queue trackers confirm active status with no construction or financing announcements.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Rosebud Solar SLF project is a proposed 130 MW solar generation facility in Falls County, Texas. The project, developed by Rosebud Solar, LLC, is located within the Electric Reliability Council of Texas (ERCOT) region. It consists of 130 MW of solar photovoltaic generation.
The project is listed in the ERCOT interconnection queue as entry ERCOT-24INR0040, with a queue entry date of April 13, 2021. The proposed commercial operation date is January 15, 2028. The project's interconnection agreement status is currently in the Facility Study phase.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Falls
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Rosebud Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 69kV 67 BAGGINS - 69 BARCLAY
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.