Leakey BESS
9.9 MW storage in — · In queue since November 2022 · Proposed COD May 2026
9.9 MW
Capacity
1
Components
Battery
3y 8m
In Queue
In Progress (unknown study)
IA Phase
Signed Jan 2023
Queue → IA
2 months
IA → COD
3y 4m
Total Duration
2 months
Schedule
2 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2026-05-16
The Leakey BESS project is a proposed 9.9 MW battery storage project located in Real County, Texas. The developer is Regis Leaky LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0548, with a queue entry date of November 29, 2022, and a proposed commercial operation date of February 6, 2025.
The project's interconnection agreement is currently listed as "In Progress (unknown study)" with an agreement date of January 18, 2023. The project consists solely of battery storage, with a total capacity of 9.9 MW. The Leakey BESS project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Regis Leaky LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Station Name (TDSP Station Code): LEAKEY; Load/Load Transformer Name: L_LEAKEY9_1Y; PTI BUS Name: 7426; Voltage in kV (Transmission Level): 69kV_x000D_ Transformers: 3x 4000kVA 800VAC Δ - 24.9kVA Υ_x000D_ 12,000 MVA connected, Running load limited to 9.99 MW
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Leakey BESSForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.