San Perlita BESS 1
150 MW storage in Willacy, TX · In queue since June 2022 · Proposed COD December 2025
150 MW
Capacity
1
Components
Battery
4y 5m
In Queue
Facility Study
IA Phase
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 6m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-15
Projected COD moved
1 time
Dec 2023 → Dec 2025
Net change
+24 months
first report to latest
Capacity
150 MW
unchanged in the reports
Latest stage
Cancelled
last listed Jul 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Jul 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
RWE announces construction start on three Texas BESS totaling 450 MW; San Perlita BESS 1 may be included but not explicitly named
rwe.comResearch sources and reasoning (1 recorded sources)
medium confidence at research time
Commercial operation date: LBNL queue date of December 2025 is the only explicit COD available. RWE's October 2024 press release announces construction start on three 450 MW combined BESS projects in Texas but does not name San Perlita BESS 1 specifically or provide individual project COD targets.
Developer: LBNL filing entity 'RWE Renewables' matches the operating company name in RWE's press release and all aggregator sites. No shell LLC detected.
Status: LBNL status is 'active' at Facility Study stage. RWE's October 2024 press release announces construction start on three Texas BESS totaling 450 MW, but does not explicitly confirm San Perlita BESS 1 is among them.
About
Generated Apr 10, 2026 · Predates Jul 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The San Perlita BESS 1 project is a proposed 150 MW battery storage project located in Willacy County, Texas. Developed by RWE Renewables, the project consists of 150 MW of battery capacity. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0496, with a queue entry date of June 2, 2022.
The proposed commercial operation date for the San Perlita BESS 1 project is December 15, 2025. Its interconnection status is currently in the Facility Study phase, and its point of interconnection is the 8601 Cebolla 345kV substation. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jul 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Willacy
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Renewables
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8601 Cebolla 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.