Hacienda Storage
201.9 MW storage in Galveston, TX · In queue since May 2022 · Proposed COD December 2027
201.9 MW
Capacity
1
Components
Battery
4y 6m
In Queue
Facility Study
IA Phase
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
Projected COD moved
3 times
Dec 2023 → Dec 2027
Net change
+48 months
first report to latest
Capacity
203 → 206 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Proposed completion date updated from June 2026 to December 17, 2026 per ERCOT queue change
interconnectionfyi.substack.comResearch sources and reasoning (6 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0485/hacienda-storage
- interconnection.fyi/project/ercot-23inr0485
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-602
- cleanview.co/power-projects/developers/belltown-power
- ercotqueue.com/project/23INR0485
Commercial operation date: LBNL shows December 2027, but Interconnection.fyi March 2025 update reports proposed completion changed to December 17, 2026. The 2026 date is more recent and reflects a queue update post-LBNL snapshot.
Developer: LBNL filing entity is 'Galveston Energy Storage LLC' (project-specific LLC). Cleanview's Belltown Power pipeline page lists Hacienda Storage as a Belltown project, indicating the operating parent company.
Status: LBNL status is 'active' at Facility Study stage with no IA date. Multiple queue trackers confirm active status with no IA, suggesting early-stage development with uncertain completion likelihood.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Hacienda Storage project is a proposed 201.9 MW battery energy storage system located in Galveston County, Texas. The project, being developed by Galveston Energy Storage LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0485, with a queue entry date of May 10, 2022.
The proposed commercial operation date for Hacienda Storage is December 1, 2027. The project's interconnection status is currently in the Facility Study phase, and it intends to connect to the 38745 Attwater 138kV point of interconnection. The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Galveston
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Galveston Energy Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
38745 Attwater 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.