Rio Nogales CT1 Rotor Replacement (ERCOT-23INR0483) — Project Summary

Queue ID
ERCOT-23INR0483
Capacity
3.1 MW
Technology
Gas
Status
active
Location
Guadalupe, TX
Region
ERCOT
Developer
CPS Energy
IA Status
IA Executed

Rio Nogales CT1 Rotor Replacement

ERCOT-23INR0483BetaActiveGasERCOTLBNL

3.1 MW generation in Guadalupe, TX · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

3.1 MW

Capacity

1

Components

Gas

—

In Queue

IA Executed

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

IA → COD

2y 11m

Schedule

12 months past proposed COD

Construction75%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 20, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2025-12-12

Queue history
23INR0483 · 44 monthly ERCOT reports, Feb 2023 – Sep 2026

Projected COD moved

5 times

Jun 2023 → Aug 2026

Net change

+38 months

first report to latest

Capacity

3 MW

unchanged in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Interconnection agreement signedJan 20, 2023
Approved for synchronizationApr 27, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Sep 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Rio Nogales CT1 Rotor Replacement project is a proposed 3.1 MW gas-fired generation project located in Guadalupe County, Texas. The project, developed by CPS Energy, is interconnected within the ERCOT region under queue ID ERCOT-23INR0483. The proposed commercial operation date (COD) is June 8, 2023.

The project has an Interconnection Agreement (IA) executed on January 20, 2023, and is currently listed as active in the ERCOT interconnection queue. The point of interconnection (POI) is the Rio Nogales Substation 5362 RIONOG 345kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Guadalupe

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CPS Energy

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Rio Nogales Substation 5362 RIONOG 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CDRVLE_U1_RN
POI Substation
Del Rio Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.