Taormina Storage (ERCOT-23INR0479) — Project Summary

Queue ID
ERCOT-23INR0479
Capacity
231.86 MW
Technology
Battery
Status
active
Location
Bexar, TX
Region
ERCOT
Developer
Taormina Storage Project LLC
IA Status
IA Executed

Taormina Storage

ERCOT-23INR0479BetaActiveBatteryERCOTLBNL + Live

231.86 MW storage in Bexar, TX · In queue since April 2022 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

231.86 MW

Capacity

1

Components

Battery

4y 7m

In Queue

IA Executed

IA Phase

Signed Apr 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 years

IA → COD

4y 1m

Total Duration

3 years

Construction75%
Queue EntryApr 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 14, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2029-05-26

Queue history
23INR0479 · 47 monthly ERCOT reports, Nov 2022 – Sep 2026

Projected COD moved

3 times

Aug 2025 → May 2029

Net change

+45 months

first report to latest

Capacity

232 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 18, 2022
Interconnection agreement signedApr 14, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
May 2029
From queue filing
Developer in saved assessment
Q ENERGY
Filed as Taormina Storage Project LLC
Status at research time
IA Executed
IA Executed — interconnection agreement with CPS Energy executed April 2025, project remains in pre-construction phase
Financing
Not recorded

Milestones in this assessment

IA executedApr 14, 2025Latest in this assessment

Interconnection Agreement executed with CPS Energy

interchange.puc.texas.gov
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0479/taormina-storage
  2. interconnection.fyi/project/ercot-23inr0479
  3. interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&FilingParty=cps%20energy&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
  4. ercot.com/files/docs/2025/08/08/Capacity-Changes-by-Fuel-Type-Charts_July_2025.xlsx
  5. qenergy.eu/fileadmin/user_upload/Q_ENERGY_Europe/1.About_Q_Energy/Financial_reports/Financial_Statements_Q_ENERGY_2023.pdf

Commercial operation date: LBNL queue shows proposed COD of May 2029. No independent news sources provide alternative dates. ERCOT capacity chart and Cleanview both cite May 2029, consistent with LBNL filing.

Developer: LBNL filing entity is 'Taormina Storage Project LLC', a project-specific shell. Q ENERGY Europe's 2023 financial statements list 'Taormina Storage Project LLC' as a subsidiary, identifying Q ENERGY as the parent operating company.

Status: LBNL shows IA executed 2025-04-14. Texas PUC filings confirm multiple amendments to Generation Interconnection Agreement with CPS Energy through June 2025, validating active IA status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Taormina Storage project is a proposed 231.86 MW battery energy storage system in Bexar County, Texas. Developed by Taormina Storage Project LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0479, with a queue entry date of April 18, 2022. The proposed commercial operation date is May 26, 2029.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465). The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bexar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Taormina Storage Project LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.