Taormina Storage
231.86 MW storage in Bexar, TX · In queue since April 2022 · Proposed COD May 2029
231.86 MW
Capacity
1
Components
Battery
4y 7m
In Queue
IA Executed
IA Phase
Signed Apr 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3 years
IA → COD
4y 1m
Total Duration
3 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2029-05-26
Projected COD moved
3 times
Aug 2025 → May 2029
Net change
+45 months
first report to latest
Capacity
232 MW
unchanged in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with CPS Energy
interchange.puc.texas.govResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0479/taormina-storage
- interconnection.fyi/project/ercot-23inr0479
- interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&FilingParty=cps%20energy&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
- ercot.com/files/docs/2025/08/08/Capacity-Changes-by-Fuel-Type-Charts_July_2025.xlsx
- qenergy.eu/fileadmin/user_upload/Q_ENERGY_Europe/1.About_Q_Energy/Financial_reports/Financial_Statements_Q_ENERGY_2023.pdf
Commercial operation date: LBNL queue shows proposed COD of May 2029. No independent news sources provide alternative dates. ERCOT capacity chart and Cleanview both cite May 2029, consistent with LBNL filing.
Developer: LBNL filing entity is 'Taormina Storage Project LLC', a project-specific shell. Q ENERGY Europe's 2023 financial statements list 'Taormina Storage Project LLC' as a subsidiary, identifying Q ENERGY as the parent operating company.
Status: LBNL shows IA executed 2025-04-14. Texas PUC filings confirm multiple amendments to Generation Interconnection Agreement with CPS Energy through June 2025, validating active IA status.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Taormina Storage project is a proposed 231.86 MW battery energy storage system in Bexar County, Texas. Developed by Taormina Storage Project LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0479, with a queue entry date of April 18, 2022. The proposed commercial operation date is May 26, 2029.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465). The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Bexar
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Taormina Storage Project LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV VH Braunig (5025) to Valley Road 138kV (5465)
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Taormina Storage
Data-driven briefing on Taormina Storage — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.