Rhoda Storage
141.23 MW storage in Milam, TX · In queue since April 2022 · Proposed COD August 2028
141.23 MW
Capacity
1
Components
Battery
4y 7m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-01
Projected COD moved
7 times
Feb 2024 → Aug 2028
Net change
+54 months
first report to latest
Capacity
35 → 141 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Standard Generation Interconnection Agreement filed with PUC between Oncor and Milam Energy, LLC
interchange.puc.texas.govResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0478/rhoda-storage
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- ercot.com/files/docs/2026/04/07/Capacity-Changes-by-Fuel-Type-Charts_March_2026.xlsx
- ercotqueue.com/project/23INR0478
Commercial operation date: LBNL queue snapshot shows August 2028 COD. ERCOT capacity chart (March 2026) confirms 2028 target. No contradictory signals from news or developer announcements.
Developer: LBNL filing entity is 'Milam Energy, LLC'. No press releases or corporate announcements found to identify a parent company. PUC filings and ERCOT documents consistently reference Milam Energy, LLC as the developer.
Status: LBNL shows 'active' status at Facility Study stage. PUC Interchange filing (Item 2392, January 28, 2026) confirms Standard Generation Interconnection Agreement between Oncor and Milam Energy, LLC for Rhoda Storage, indicating active progression through interconnection process.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed XE Rhoda Storage project is a 141.23 MW battery energy storage system located in Milam County, Texas. Developed by Milam Energy, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0478, with a queue entry date of April 18, 2022. The proposed commercial operation date is April 7, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.
The point of interconnection for the XE Rhoda Storage project is Tap 138kV 32 Robertson - 64 Milano. The project consists solely of battery storage, with a total capacity of 141.23 MW. The project has appeared in recent news coverage regarding energy storage development in Texas.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Milam
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Milam Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 138kV 32 Robertson - 64 Milano
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Robertson Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.