Bexar ESS (ERCOT-23INR0381) — Project Summary

Queue ID
ERCOT-23INR0381
Capacity
102.6 MW
Technology
Battery
Status
active
Location
Bexar, TX
Region
ERCOT
Developer
Bexar ESS LLC
IA Status
IA Executed

Bexar ESS

ERCOT-23INR0381BetaActiveBatteryERCOTLBNL

102.6 MW storage in Bexar, TX · In queue since September 2021 · Proposed COD December 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

102.6 MW

Capacity

1

Components

Battery

5y 2m

In Queue

IA Executed

IA Phase

Signed Jul 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 10m

IA → COD

2y 5m

Total Duration

1y 10m

Schedule

11 months past proposed COD

Construction75%
Queue EntrySep 21, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJul 31, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2025-12-31

Queue history
23INR0381 · 50 monthly ERCOT reports, Jan 2022 – Feb 2026

Projected COD moved

10 times

Aug 2024 → Feb 2026

Net change

+18 months

first report to latest

Capacity

102 → 103 MW

changed in the reports

Latest stage

Commercial operation

last listed Feb 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 21, 2021
Facilities study approvedJul 8, 2024
Interconnection agreement signedJul 31, 2023
Approved for energizationMay 6, 2025
Approved for synchronizationJun 3, 2025
Approved for commercial operationMar 12, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2027
Differs from queue: Dec 31, 2025
Developer in saved assessment
OCI Energy
Filed as Bexar ESS LLC
Status at research time
Construction
Construction — groundbreaking occurred May 2026, targeting 2027 COD per developer announcement
Financing
Secured
20-year PPA with CPS Energy announced December 2024, project financed and under construction as of May 2026 groundbreaking

Milestones in this assessment

IA executedJul 31, 2023

Interconnection Agreement executed with ERCOT

newsroom.cpsenergy.com
Financing closeDec 6, 2024

20-year PPA announced with CPS Energy for 120MW/480MWh Alamo City ESS project

newsroom.cpsenergy.com
GroundbreakingMay 20, 2026

OCI Energy breaks ground on Alamo City ESS project in Bexar County

upi.com
COD target2027Latest in this assessment

Project targeting 2027 commercial operation per groundbreaking announcement

en.sedaily.com
Research sources and reasoning (7 recorded sources)

high confidence at research time

  1. newsroom.cpsenergy.com/cps-energy-battery-storage/
  2. upi.com/Top_News/World-News/2026/05/20/OCI-holdings-texas-power-project/8841779282024/
  3. expressnews.com/business/article/cps-oci-battery-site-san-antonio-bexar-county-19964817.php
  4. bicmagazine.com/industry/tank-term-storage/oci-and-cps-energy-announce-battery-energy-storage-system-in-texas/
  5. en.sedaily.com/finance/2026/05/20/oci-holdings-breaks-ground-on-texas-ess-project-with-cps
  6. electrek.co/2024/12/06/battery-storage-project-will-boost-san-antonio-grid/
  7. power-technology.com/news/oci-energy-cps-energy/

Commercial operation date: LBNL proposed COD was 2025-12-31, but May 2026 groundbreaking announcement from OCI Holdings states the project targets 2027 commercial operation. This is consistent with typical 12-18 month construction timeline for battery storage.

Developer: LBNL filing entity is 'Bexar ESS LLC' (project shell), but all press releases and news coverage identify OCI Energy (U.S. subsidiary of South Korea's OCI Holdings) as the actual developer and operator.

Status: LBNL shows 'Active' with IA executed July 2023. May 2026 groundbreaking announcements from OCI Holdings and multiple news sources confirm construction has commenced.

Project lifecycle
as of 2024-12-09
TechnologyBatterySan Antonio Express-News · 2024-12-09
DeveloperOCI EnergySan Antonio Express-News · 2024-12-09
PPA offtakerCPS EnergySan Antonio Express-News · 2024-12-09

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Bexar ESS project is a proposed 102.6 MW battery storage project located in Bexar County, Texas. Developed by Bexar ESS LLC, the project consists entirely of battery storage. It is interconnected within the ERCOT region under queue ID ERCOT-23INR0381, with an interconnection queue entry date of September 21, 2021. The proposed commercial operation date is February 10, 2026, and the Interconnection Agreement was executed on July 31, 2023.

The project is linked to the existing Bexar ESS operating plant (EIA plant ID 66400). The Bexar ESS project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Feb 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Bexar

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bexar ESS LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5007 Alamo One 138kV

Data Source

LBNL

DeveloperOCI EnergySan Antonio Express-News · 2024-12-09
TransactionPPASan Antonio Express-News · 2024-12-09
OfftakerCPS EnergySan Antonio Express-News · 2024-12-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
RN_OCI_ALAMO
POI Substation
OCI Alamo 1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.