Bordertown BESS (ERCOT-23INR0354) — Project Summary

Queue ID
ERCOT-23INR0354
Capacity
100 MW
Technology
Battery
Status
active
Location
Starr, TX
Region
ERCOT
Developer
—
IA Status
—

Bordertown BESS

ERCOT-23INR0354BetaActiveBatteryERCOTLBNL + Live

100 MW storage in Starr, TX · In queue since August 2021 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

100 MW

Capacity

1

Components

Battery

5y 3m

In Queue

—

IA Status

Signed Oct 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 2m

IA → COD

6y 2m

Total Duration

1y 2m

Construction0%
Queue EntryAug 31, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 12, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-12-01

Queue history
23INR0354 · 59 monthly ERCOT reports, Sep 2021 – Sep 2026

Projected COD moved

7 times

Jun 2023 → Dec 2028

Net change

+66 months

first report to latest

Capacity

106 → 100 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 1, 2021
Interconnection agreement signedOct 12, 2022
On ERCOT's inactive listDec 2025 – Jan 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Dec 1, 2028
Developer in saved assessment
Recurrent Energy
Ownership change in saved research
Status at research time
Active
Active — project advancing through permitting with preliminary plat approved December 2024, construction expected 2026
Financing
In progress
Recurrent Energy seeking construction loan from North American Development Bank (NADBank) as of August 2024 for sister project Fort Duncan BESS; Bordertown BESS financing not explicitly announced but likely parallel track
Ownership history
  1. 2022-06·Black Mountain Energy Storage→Recurrent Energyenergy-storage.news

Milestones in this assessment

Ownership changeJun 2022

Black Mountain Energy Storage sold Bordertown BESS and Fort Duncan BESS (400MWh total) to Recurrent Energy

energy-storage.news
IA executedOct 12, 2022

ERCOT Standard Generation Interconnection Agreement executed between AEP Texas Inc. and Bordertown BESS LLC

interchange.puc.texas.gov
Permit approvedDec 2024

Preliminary plat approved for Bordertown BESS Subdivision for battery energy storage facility

cdn.prod.website-files.com
COD target2026Latest in this assessment

ERCOT capacity planning documents list 2026 expected online date

ercot.com
Research sources and reasoning (7 recorded sources)

high confidence at research time

  1. energy-storage.news/canadian-solar-subsidiary-recurrent-buys-400mwh-standalone-storage-projects-in-ercot/
  2. bmenergystorage.com/news/black-mountain-sells-two-texas-standalone-storage-projects/
  3. cdn.prod.website-files.com/64da3765f9dc556c39e2a301/674de907ee257067003da120_PZ_MEMO_12.2.24.pdf
  4. ercot.com/files/docs/2025/03/07/CapacityChangesbyFuelTypeCharts_February_2025.xlsx
  5. ercot.com/files/docs/2025/07/07/MORA_September2025.pdf
  6. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  7. energy-storage.news/nadbank-says-recurrent-energy-texas-bess-carries-acceptable-risk-for-construction-loan/

Commercial operation date: ERCOT's July 2025 MORA report lists Bordertown BESS with a 2026 expected online date, and the February 2025 capacity changes spreadsheet also shows 2026. This is 2 years earlier than LBNL's 2028-12-01 filing date, reflecting updated project timeline.

Developer: LBNL filing entity is 'Bordertown BESS LLC' (shell LLC). Black Mountain Energy Storage originally developed the project but sold it to Recurrent Energy (Canadian Solar subsidiary) in June 2022, confirmed by multiple sources including Energy-Storage.News and Black Mountain's own announcement.

Status: LBNL status is 'active' which aligns with ground reality. December 2024 preliminary plat filing for subdivision shows active permitting progress, and ERCOT's 2025 reports consistently list 2026 as expected online date.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Bordertown BESS project is a proposed 100 MW battery storage project located in Starr County, Texas. Developed by Bordertown BESS LLC, the project entered the ERCOT interconnection queue as ERCOT-23INR0354 on September 1, 2021. The project's proposed commercial operation date is June 15, 2027.

The Bordertown BESS project has an Interconnection Agreement (IA) executed on October 12, 2022. The point of interconnection is the 8796 Roma 138kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Starr

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.