Seven Flags BESS
102.7 MW storage in Webb, TX · In queue since September 2021 · Proposed COD January 2026
102.7 MW
Capacity
1
Components
Battery
5y 2m
In Queue
IA Executed
IA Phase
Signed May 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 8m
IA → COD
2y 8m
Total Duration
1y 8m
Schedule
11 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2026-01-07
Projected COD moved
13 times
Jun 2023 → Jan 2026
Net change
+31 months
first report to latest
Capacity
106 → 103 MW
changed in the reports
Latest stage
Commercial operation
last listed Jan 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
$252M construction financing closed for 100MW/200MWh Seven Flags BESS in Laredo
paulhastings.comResearch sources and reasoning (4 recorded sources)
high confidence at research time
- paulhastings.com/news/paul-hastings-advises-spearmint-on-usd252-million-battery-energy-storage-systems-financing
- cleanview.co/power-projects/operating/battery-storage-projects/texas/66689/seven-flags-bess-llc
- energy-storage.news/spearmint-energy-secures-us250-million-for-two-texas-bess-totalling-400mwh/
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
Commercial operation date: LBNL proposed COD of 2026-01-07 aligns with Cleanview reporting the project became operational in 2026, and Paul Hastings April 2025 financing announcement for construction supports a 2026 timeline.
Developer: Paul Hastings press release (April 2025) explicitly identifies Spearmint Energy as the developer securing $252M financing for Seven Flags BESS, while LBNL filing uses the project-LLC 'Seven Flags BESS LLC'.
Status: LBNL status 'active' with IA executed (May 2023) is accurate. April 2025 financing close for $252M indicates construction phase, consistent with 2026 COD target.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Seven Flags BESS is a proposed 102.7 MW battery storage project located in Webb County, Texas. The project, developed by Seven Flags BESS LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0351. It entered the queue on September 1, 2021, with a proposed commercial operation date of December 15, 2025. The interconnection agreement was executed on May 19, 2023.
The development project is linked to the existing operating plant Seven Flags BESS LLC (EIA plant ID 66689). The project has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jan 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Webb
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Seven Flags BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8295 Wormser Substation 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- HIGH
- POI Substation
- Wormser Road Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Seven Flags BESSForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.