Tokio Solar (ERCOT-23INR0349) — Project Summary

Queue ID
ERCOT-23INR0349
Capacity
170.45 MW
Technology
Solar
Status
active
Location
Mclennan, TX
Region
ERCOT
Developer
Gransolar Texas Eight, LLC
IA Status
IA Executed

Tokio Solar

ERCOT-23INR0349BetaActiveSolarERCOTLBNL + Live

170.45 MW generation in Mclennan, TX · In queue since August 2021 · Proposed COD August 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

170.45 MW

Capacity

1

Components

Solar

5y 3m

In Queue

IA Executed

IA Phase

Signed Nov 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 3m

IA → COD

3y 9m

Total Duration

2y 3m

Construction75%
Queue EntryAug 12, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 6, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-08-25

Queue history
23INR0349 · 53 monthly ERCOT reports, May 2022 – Sep 2026

Projected COD moved

3 times

Oct 2024 → Aug 2027

Net change

+34 months

first report to latest

Capacity

175 → 170 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedAug 12, 2021
Facilities study approvedApr 11, 2023
Interconnection agreement signedNov 6, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Aug 25, 2027
From queue filing
Developer in saved assessment
Gransolar Group
Filed as Gransolar Texas Eight, LLC
Status at research time
Active
Active — IA executed Nov 2023, no construction announcements found in public sources
Financing
Not recorded

Milestones in this assessment

IA executedNov 6, 2023Latest in this assessment

Interconnection Agreement executed between Oncor Electric Delivery Company LLC and Gransolar Texas Eight, LLC

interchange.puc.texas.gov
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. gem.wiki/Tokio_Solar
  2. aterio.io/insights/us-energy-projects/ep/tokio-solar-project
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&ItemMatch=Equal&DocumentType=ALL&SortBy=FilingDescription&SortOrder=Ascending
  4. mbrweb.ferc.gov/SearchlkpEIA/Index?page=762
  5. ercot.com/files/docs/2024/11/01/MORA_January2025.xlsx

Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-08-25. No contradicting news or press releases found; search results only reference the project in databases and regulatory filings without updated COD information.

Developer: LBNL filing entity is 'Gransolar Texas Eight, LLC' (project-specific shell). Aterio database and Global Energy Monitor reference the parent company 'Gransolar Group' as the developer.

Status: LBNL shows 'active' status with IA executed on 2023-11-06. Texas PUC filings confirm Generation Interconnection Agreement between Oncor and Gransolar Texas Eight, LLC dated March 2024. No withdrawal or construction milestones announced.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tokio Solar is a proposed solar generation project located in McLennan County, Texas, with a total capacity of 170.45 MW. The project, developed by Gransolar Texas Eight, LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0349. The project entered the queue on August 12, 2021, and has a proposed commercial operation date of August 25, 2027. The Interconnection Agreement (IA) was executed on November 6, 2023.

The proposed project is linked to the existing Tokio Solar operating plant (EIA plant ID 66397). Recent news coverage indicates industry interest in the development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Mclennan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Gransolar Texas Eight, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 138kV 3592 Waco Atco - 170 Cotton Belt

Data Source

LBNL + Live

DeveloperAdapture Renewables±Business Wire · 2025-03-04
PartnerRosendin Renewable Energy GroupConstruction Review · 2026-03-26
CompanyTokyo Gas America±Construction Review · 2026-03-26
TransactionDebt financing±Business Wire · 2025-03-04
Deal value$321.0MBusiness Wire · 2025-03-04
LenderMUFGBusiness Wire · 2025-03-04
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
POI Substation
Cotton Belt Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.