BRP Aras BESS
303.59 MW storage in Upton, TX · In queue since May 2021 · Proposed COD December 2028
303.59 MW
Capacity
1
Components
Battery
5y 6m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 7m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
Projected COD moved
3 times
Oct 2023 → Dec 2028
Net change
+62 months
first report to latest
Capacity
304 MW
unchanged in the reports
Latest stage
Cancelled
last listed Mar 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-23inr0272
- interxdata.com/projects/brp-aras-bess-ercot-23inr0272/
- ercotqueue.com/developer/brp-aras-bess-llc
- energy-storage.news/gridstor-acquires-150mw-300mwh-texas-bess-from-brp/
- renewablesnow.com/news/gridstor-buys-150-mw300-mwh-battery-project-in-texas-1270261/
Commercial operation date: Only the LBNL proposed COD (2028-12-01) exists. interconnection.fyi shows Nov 30, 2028, which is the same ERCOT-derived date and not independent. No developer press release or news article gives a financing-backed COD for this project.
Developer: Every source names BRP Aras BESS LLC as the owner. The 'BRP' prefix may point to Balanced Rock Power, which sold a 150MW/300MWh Texas BESS to GridStor. The snippets don't name that project, and 150 MW doesn't match this 303.59 MW project, so I did not link them or record an ownership change.
Status: LBNL and ercotqueue.com show the project as active. interxdata, whose page is dated Jul 2026, also shows it active. The single 'withdrawn' listing is unconfirmed and may reflect a different data pull, so LBNL's status is kept.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The BRP Aras BESS project is a proposed 303.59 MW battery storage project located in Upton County, Texas. The developer is BRP Aras BESS LLC. It is interconnected to the ERCOT grid under queue ID ERCOT-23INR0272, with a queue entry date of May 31, 2021. The proposed commercial operation date is December 1, 2028.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 76595 North McCamey 138kV location. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Mar 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Upton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Aras BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
76595 North McCamey 138kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- North McCamey Subsation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.