Tiger Solar (ERCOT-23INR0244) — Project Summary

Queue ID
ERCOT-23INR0244
Capacity
250.9 MW
Technology
Solar
Status
active
Location
Jones, TX
Region
ERCOT
Developer
Vaca Del Sol, LLC
IA Status
IA Executed

Tiger Solar

ERCOT-23INR0244BetaActiveSolarERCOTLBNL + Live

250.9 MW generation in Jones, TX · In queue since April 2021 · Proposed COD February 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

250.9 MW

Capacity

1

Components

Solar

5y 7m

In Queue

IA Executed

IA Phase

Signed Oct 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 6m

IA → COD

2y 4m

Total Duration

3y 6m

Construction75%
Queue EntryApr 29, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 30, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-02-26

Queue history
23INR0244 · 65 monthly ERCOT reports, Apr 2021 – Sep 2026

Projected COD moved

4 times

Dec 2023 → Feb 2027

Net change

+38 months

first report to latest

Capacity

306 → 251 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 29, 2021
Facilities study approvedDec 15, 2025
Interconnection agreement signedOct 30, 2024
On ERCOT's inactive listMar 2022 – Mar 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 20 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonecivil construction and site preparation · 2024-09SolarQuarter · 2025-03-05

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 30, 2027
Differs from queue: Feb 26, 2027From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — IA executed Oct 2024, no construction announcements found
Financing
Not recorded

Milestones in this assessment

IA executedOct 30, 2024Latest in this assessment

Interconnection Agreement executed with ERCOT

lbnl_queue_snapshot
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. gem.wiki/Tiger_Solar_solar_farm

Commercial operation date: Only LBNL queue data provides a COD target of 2027-06-30. No news or research findings discuss this specific ERCOT utility-scale project's timeline.

Developer: LBNL lists 'Vaca Del Sol, LLC' as developer. Search results only returned unrelated 'Tiger Solar' entities (a Virginia/Michigan residential solar installer). No evidence connects the residential company to this 250.9 MW ERCOT utility-scale project.

Status: LBNL shows 'active' status with IA executed 2024-10-30. No news coverage of construction start or project updates found in search results.

Project lifecycle
as of 2025-03-05
PhaseConstructionSolarQuarter · 2025-03-05
OperationalNoSolarQuarter · 2025-03-05
TechnologySolarSolarQuarter · 2025-03-05
EPC contractorJones PowerSolarQuarter · 2025-03-05
GroundbreakingAnnouncedSolarQuarter · 2025-03-05

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Tiger Solar is a proposed 255 MW solar generation project located in Jones County, Texas. Developed by Vaca Del Sol, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-23INR0244, with an interconnection queue entry date of April 29, 2021. The proposed commercial operation date is June 30, 2027, and the Interconnection Agreement (IA) was executed on October 30, 2024. The point of interconnection is the 68004 PHANTOM HILL 345KV substation.

The proposed project is linked to the existing, operating Tiger Solar facility (EIA plant ID 67357). Recent news coverage has highlighted the project, with articles focusing on industry and development aspects.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Jones

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Vaca Del Sol, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

68004 PHANTOM HILL 345KV

Data Source

LBNL + Live

EPC contractorJones PowerSolarQuarter · 2025-03-05
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ANSON1_ALL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.