Maleza Solar II
254.94 MW hybrid in Wharton, TX · In queue since April 2021 · Proposed COD December 2028
254.94 MW
Capacity
1
Components
Solar
5y 7m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 8m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
Projected COD moved
12 times
Jun 2023 → Dec 2028
Net change
+66 months
first report to latest
Capacity
255 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
medium confidence at research time
- cleanview.co/developer/sunchase-power
- cleanview.co/power-projects/developers/sunchase-power
- ercotqueue.com/project/23INR0227
- ercotqueue.com/developer/brush-solar-llc
- interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=35077&ItemMatch=Equal&FilingParty=centerpoint&DocumentType=ALL&SortBy=FilingParty&SortOrder=Descending
Commercial operation date: Only LBNL queue snapshot provides a COD target of 2028-12-31. No news or press releases found with updated timeline information.
Developer: LBNL filing entity is 'Brush Solar, LLC' (project-specific LLC). Cleanview database lists both Maleza Solar and Maleza Solar II under SunChase Power's development pipeline, indicating SunChase Power is the parent/operating company.
Status: LBNL status is 'active' with IA status at 'Facility Study'. ERCOTqueue confirms project remains in queue without IA, suggesting early-stage development with low completion probability.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Maleza Solar II project is a proposed 254.94 MW solar generation project located in Wharton County, Texas. The developer is Brush Solar, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0227, with a queue entry date of April 6, 2021. The proposed commercial operation date is December 31, 2028. The project's interconnection agreement status is currently in the Facility Study phase, and the point of interconnection is the tap Blue _x0013_ Hillje 345 kv Ckt.#27.
The proposed project consists of 254.94 MW of solar generation capacity. The Maleza Solar II project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wharton
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Brush Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap Blue – Hillje 345 kv Ckt.#27
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage pipeline in ERCOT
Data tables and metrics from the InfraSure database.
Maleza Solar II
Data-driven briefing on Maleza Solar II — fleet, generation, financial, and news signals.
Rush Solar
Data-driven briefing on Rush Solar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.