Outpost Storage (ERCOT-23INR0209) — Project Summary

Queue ID
ERCOT-23INR0209
Capacity
508.1 MW
Technology
Solar+Battery
Status
active
Location
Webb, TX
Region
ERCOT
Developer
Hecate Energy Outpost Storage LLC
IA Status
Facility Study

Outpost Storage

ERCOT-23INR0209BetaActiveBatteryBatteryERCOTLBNL + Live

508.1 MW generation in Webb, TX · In queue since March 2021 · Proposed COD March 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

508.1 MW

Capacity

1

Components

Battery

5y 8m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7 years

Facilities Study50%
Queue EntryMar 1, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

Queue history
23INR0209 · 68 monthly ERCOT reports, Feb 2021 – Sep 2026

Projected COD moved

5 times

May 2023 → Mar 2028

Net change

+58 months

first report to latest

Capacity

508 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 1, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 1, 2028
From queue filing
Developer in saved assessment
Hecate Energy
Filed as Hecate Energy Outpost Storage LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no executed IA. Hecate lists it as 'In Development', and there is no sign of construction or withdrawal.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. hecateenergy.com/projects/
  2. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0209/outpost-storage
  3. ercotqueue.com/project/23INR0209
  4. legacy.webbcountytx.gov/TaxAbatementAgreements/12-11-2023%20Item%2026%20-%20Tax%20Abatement%20Hecate%20Energy%20Outpost%20Storage%20LLC.pdf

Commercial operation date: Only the LBNL/ERCOT queue date (2028-03-01) is available. Cleanview's "expected to come online in March 2028" looks derived from the same queue data, so it is not independent confirmation. The Hecate site lists the project only as "In Development" and gives no date.

Developer: The LBNL filing entity is a project LLC named for Hecate Energy. Hecate Energy's own projects page lists Outpost Storage (TX, ~500 MW) as in development, which makes Hecate Energy the operating developer. No ownership change was found in the sources.

Status: LBNL shows active status with a Facility Study IA status. ercotqueue.com reports 'No IA' and a 9% build-chance, and Hecate's project page shows the project still in development.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Outpost Storage project is a proposed 508.1 MW battery energy storage system in Webb County, Texas. The project, developed by Hecate Energy Outpost Storage LLC, is currently in the ERCOT interconnection queue as entry ERCOT-23INR0209, with a queue entry date of March 1, 2021. Its proposed commercial operation date is March 1, 2028.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Tap 345kV 80219 Lobo - 5709 Fowlerton. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Webb

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Outpost Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 80219 Lobo - 5709 Fowlerton

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
HIGH
Nearest Node (Estimated)
OUTP_SLR_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.