Erath County Solar (ERCOT-23INR0202) — Project Summary

Queue ID
ERCOT-23INR0202
Capacity
207.4 MW
Technology
Solar
Status
active
Location
Erath, TX
Region
ERCOT
Developer
Erath County Solar, LLC
IA Status
IA Executed

Erath County Solar

ERCOT-23INR0202BetaActiveSolarERCOTLBNL + Live

207.4 MW generation in Erath, TX · In queue since March 2021 · Proposed COD January 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

207.4 MW

Capacity

1

Components

Solar

5y 8m

In Queue

IA Executed

IA Phase

Signed Jun 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 3m

IA → COD

5y 7m

Total Duration

2y 3m

Construction75%
Queue EntryMar 8, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 1, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2029-01-31

Queue history
23INR0202 · 67 monthly ERCOT reports, Mar 2021 – Sep 2026

Projected COD moved

5 times

Dec 2023 → Jan 2029

Net change

+61 months

first report to latest

Capacity

227 → 207 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 8, 2021
Interconnection agreement signedJun 1, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Nov 2028
Differs from queue: Jan 31, 2029
Developer in saved assessment
NextEra Energy Resources
Filed as Erath County Solar, LLC
Status at research time
Active
Active — facing local opposition, IA executed June 2023, construction timeline targeting late 2028
Financing
Not recorded

Milestones in this assessment

IA executedJun 2023

Interconnection Agreement executed with ERCOT

nexteraenergyresources.com
COD targetNov 2028Latest in this assessment

Expected online date November 2028 per Cleanview tracking

cleanview.co
Research sources and reasoning (4 recorded sources)

high confidence at research time

  1. nexteraenergyresources.com/erath-county-solar.html
  2. nexteraenergyresources.com/erath-county-solar/project-overview.html
  3. cleanview.co/planned-solar-projects/TX/67353_4666/erath-county-solar
  4. facebook.com/groups/erathcountystopsolarfarmshere/posts/827775371265486/

Commercial operation date: Cleanview database shows expected online date of November 2028, which is ~2 months earlier than LBNL's 2029-01-31 target. This represents a minor timing difference likely due to updated project schedules.

Developer: NextEra Energy Resources operates dedicated project pages for 'Erath County Solar' describing it as their project with up to 225 MW capacity. LBNL filing entity 'Erath County Solar, LLC' is the typical project-specific shell LLC structure NextEra uses.

Status: LBNL shows IA executed in June 2023 with active status. Facebook post from August 2021 indicates local community opposition efforts to halt construction, but project remains in queue with executed interconnection agreement.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Erath County Solar project is a 207.4 MW solar generation facility in Erath County, Texas. The developer is Erath County Solar, LLC. The project is interconnected within the ERCOT region and is listed in the ERCOT interconnection queue as entry 23INR0202, with a queue entry date of March 8, 2021. The proposed commercial operation date is January 31, 2029. The project's Interconnection Agreement (IA) was executed on June 1, 2023.

This proposed project is linked to the existing Erath County Solar operating plant (EIA ID 67353). The project has been the subject of recent news coverage, with nine articles appearing in industry and regulatory publications.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Erath

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Erath County Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 68020 Romney1E - 68030 KopperlW

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.