Paradiso BESS
100.92 MW storage in Atascosa, TX · In queue since March 2021 · Proposed COD March 2028
100.92 MW
Capacity
1
Components
Battery
5y 8m
In Queue
IA Executed
IA Phase
Signed Apr 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 1m
IA → COD
2y 11m
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Started, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2028-03-15
Projected COD moved
4 times
Jun 2023 → Mar 2028
Net change
+57 months
first report to latest
Capacity
101 → 102 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
ERCOT Standard Generation Interconnection Agreement executed between AEP Texas Inc. and VESI 13 LLC
interchange.puc.texas.govExpected commercial operation date March 2028 per project tracking databases
cleanview.coResearch sources and reasoning (5 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0200/paradiso-bess
- interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-db7
- ercot.com/files/docs/2025/12/05/MORA_February2026.pdf
- modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx
Commercial operation date: LBNL proposed COD of March 2028 is corroborated by multiple independent sources: Cleanview lists 'March 2028', Interconnection.fyi notes 'April 2, 2028' as updated target, and ERCOT MORA document from Dec 2025 lists 2028. No conflicting dates found in research.
Developer: LBNL lists 'VESI 13' as developer, and Texas PUC filings confirm 'VESI 13 LLC' as the legal entity executing the interconnection agreement with AEP Texas. No press releases or corporate announcements found identifying a parent operating company; VESI 13 appears to be the actual developer rather than a shell LLC.
Status: LBNL status 'Active' with IA executed April 18, 2025 is confirmed by Texas PUC filings showing executed interconnection agreement. ERCOT buildout pipeline from May 2024 notes 'SS Completed' (system studies completed). No construction or financing announcements found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Paradiso BESS project is a proposed 100.92 MW battery storage project located in Atascosa County, Texas. Developed by VESI 13, the project is interconnected within the Electric Reliability Council of Texas (ERCOT) region under queue ID ERCOT-23INR0200. The project entered the interconnection queue on March 1, 2021, and has a proposed commercial operation date of March 15, 2028. Its interconnection agreement status is currently in the Facility Study phase.
The Paradiso BESS project has been the subject of recent news coverage, with five articles published across industry, grid, and regulatory categories.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Atascosa
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
VESI 13
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
8203 Pleasanton 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- MEDIUM
- POI Substation
- Pleasanton Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.