Campsey Wind
238.3 MW generation in Jack, TX · In queue since February 2021 · Proposed COD June 2028
238.3 MW
Capacity
1
Components
Wind
5y 9m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Completed, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
Projected COD moved
5 times
May 2024 → Jun 2028
Net change
+49 months
first report to latest
Capacity
242 → 238 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
medium confidence at research time
- cleanview.co/power-projects/planned/wind-farms/texas/23INR0174/campsey-wind
- renewablesinfo.org/project/ercot-23inr0174-campsey-wind
- interconnection.fyi/project/ercot-23inr0174
- ercotqueue.com/developer/rwe
- facebook.com/groups/1072789571678289/posts/1135857228704856/
Commercial operation date: LBNL queue snapshot shows June 2028 COD. Multiple aggregator sites (Cleanview, renewablesinfo.org) echo May/June 2028, but these appear to be derivative of the LBNL filing rather than independent developer announcements. No press releases or financing announcements found to validate or update this date.
Developer: LBNL filing entity 'RWE Clean Energy Development, LLC' is the standard project-development subsidiary of RWE, a major international renewable energy company. No evidence of shell LLC usage or ownership changes. All sources consistently attribute the project to RWE.
Status: LBNL shows 'active' status at Facility Study stage. Multiple queue-tracking sites (interconnection.fyi, ercotqueue.com, renewablesinfo.org) confirm Active status as of 2026. Single Facebook community post claiming 'WITHDRAWN' is contradicted by all authoritative sources and likely reflects confusion with a different project or outdated data.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Campsey Wind project is a proposed 238.3 MW wind generation facility located in Jack County, Texas. The project, developed by RWE, is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0174, with a queue entry date of February 9, 2021. The proposed commercial operation date is June 1, 2028.
The Campsey Wind project's interconnection status is currently in the Facility Study phase. The point of interconnection is the tap 345kV 1458 Cobb - 1429 Jacksboro. The project has appeared in recent news.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Jack
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Clean Energy Development, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 1458 Cobb - 1429 Jacksboro
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Fort Cobb
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Campsey Wind
Data-driven briefing on Campsey Wind — fleet, generation, financial, and news signals.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.