Goodalta Solar (ERCOT-23INR0171) — Project Summary

Queue ID
ERCOT-23INR0171
Capacity
221.36 MW
Technology
Solar
Status
active
Location
Navarro, TX
Region
ERCOT
Developer
GoodAlta Power Center LLC
IA Status
Facility Study

Goodalta Solar

ERCOT-23INR0171BetaActiveSolarERCOTLBNL + Live

221.36 MW generation in Navarro, TX · In queue since January 2021 · Proposed COD September 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

221.36 MW

Capacity

1

Components

Solar

5y 10m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 8m

Facilities Study50%
Queue EntryJan 25, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-20

Queue history
23INR0171 · 69 monthly ERCOT reports, Jan 2021 – Sep 2026

Projected COD moved

5 times

Feb 2023 → Sep 2027

Net change

+55 months

first report to latest

Capacity

185 → 221 MW

changed in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 25, 2021
Facilities study approvedFeb 17, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 20, 2027
From queue filing
Developer in saved assessment
GoodAlta Power Center LLC
From queue filing
Status at research time
Active
Active — Facility Study stage, tax abatement agreement approved by Kerens ISD in 2022, no construction timeline announced
Financing
Not recorded

Milestones in this assessment

Permit approvedApr 2022

Kerens ISD approved tax value limitation agreement payments for Goodalta Solar Project

themonitor.net
Permit approvedMay 6, 2022Latest in this assessment

Texas Comptroller certification for Chapter 313 tax abatement for 180 MW solar facility near Kerens

assets.comptroller.texas.gov
Research sources and reasoning (7 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/23INR0171/goodalta-solar
  2. interconnection.fyi/project/ercot-23inr0171
  3. assets.comptroller.texas.gov/ch313/1694/1694-kerens-goodalta-cert.pdf
  4. themonitor.net/news/kerens-isd-approves-solar-project-payments
  5. ercotqueue.com/project/23INR0171
  6. assets.comptroller.texas.gov/ch313/1694/1694-kerens-goodalta-findings.pdf
  7. comptroller.texas.gov/economy/docs/active-list.xlsx

Commercial operation date: Only LBNL queue snapshot provides a COD of 2027-09-20. No news sources or press releases found with alternative dates. Texas Comptroller documents from 2022 mention the project is 'planned' but provide no specific COD.

Developer: All sources consistently identify GoodAlta Power Center LLC as the developer. No parent company or operating entity identified in any search results. Appears to be a project-specific LLC with no public parent disclosed.

Status: LBNL shows 'Active' status in Facility Study phase. Texas Comptroller documents confirm tax value limitation agreement was approved in 2022, indicating project remains viable, though no recent construction or financing announcements found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Goodalta Solar project is a proposed 221.36 MW solar generation facility in Navarro County, Texas. Developed by GoodAlta Power Center LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0171, with a queue entry date of January 25, 2021. The proposed commercial operation date is September 20, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection is tap 138kV 3127 Trinidad - 212 Winkler. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Navarro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

GoodAlta Power Center LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 3127 Trinidad - 212 Winkler

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
TRSES_UNIT6
POI Substation
Trinidad Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.