Umbra (Stockyard) BESS (ERCOT-23INR0156) — Project Summary

Queue ID
ERCOT-23INR0156
Capacity
72.98 MW
Technology
Battery
Status
suspended
Location
Franklin, TX
Region
ERCOT
Developer
—
IA Status
—

Umbra (Stockyard) BESS

ERCOT-23INR0156BetaSuspendedBatteryERCOTLBNL

72.98 MW storage in Franklin, TX · In queue since January 2021

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

72.98 MW

Capacity

1

Components

Battery

5y 10m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 10m

Suspended0%
Queue EntryJan 24, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Queue history
23INR0156 · 47 monthly ERCOT reports, Jan 2021 – Nov 2024

Projected COD moved

5 times

Jul 2023 → Apr 2027

Net change

+45 months

first report to latest

Capacity

73 → 73 MW

changed in the reports

Latest stage

Cancelled

last listed Nov 2024

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 25, 2021
Facilities study approvedJun 16, 2022
Interconnection agreement signedOct 11, 2022
CancelledMar 23, 2026
On ERCOT's inactive listDec 2024 – Feb 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Umbra (Stockyard) BESS project is a proposed 72.98 MW battery storage project located in Franklin County, Texas. The project is in the ERCOT interconnection queue as entry ERCOT-23INR0156. Its status is currently listed as suspended.

The project consists of 72.98 MW of battery capacity. The Umbra (Stockyard) BESS project is listed under the queue of the ERCOT entity.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Nov 2024.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Franklin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.