Seine BESS
301.19 MW storage in Foard, TX · In queue since December 2020 · Proposed COD October 2027
301.19 MW
Capacity
1
Components
Battery
5y 11m
In Queue
IA Executed
IA Phase
Signed Dec 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4 years
IA → COD
2y 10m
Total Duration
4 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
SS Completed, FIS Completed, IA
Project under construction
Typical: 6–18 months
Proposed COD: 2027-10-01
Projected COD moved
3 times
Oct 2023 → Oct 2027
Net change
+48 months
first report to latest
Capacity
302 → 309 MW
changed in the reports
Latest stage
IA signed
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
ERCOT standard generation interconnection agreement between Electric Transmission Texas, LLC and BRP Seine BESS LLC filed 12/3/2024.
interchange.puc.texas.govResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- interchange.puc.texas.gov/Search/Filings?ControlNumber=35077&ItemMatch=0&SortBy=ItemNumber&SortOrder=Descending
- cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0140/seine-bess
- ercotqueue.com/project/23INR0140
- interconnection.fyi/project/ercot-23inr0140
Commercial operation date: Cleanview shows 'expected to come online in October 2027', matching the LBNL proposed COD of 2027-10-01. It appears to mirror the ERCOT queue data rather than give an independent developer target. No press release or news article gives a different date.
Developer: The LBNL filing, the PUC Interchange interconnection agreement and the ERCOT queue trackers all name BRP Seine BESS LLC. No source names a parent or operating company, so the shell-versus-parent question can't be resolved from this evidence.
Status: The PUC Interchange filing for the BRP Seine BESS interconnection agreement confirms the LBNL IA Executed status (IA date 2024-12). ercotqueue.com also lists IA and FIS as complete. No source shows withdrawal or construction.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Seine BESS project is a proposed 301.19 MW battery storage project located in Foard County, Texas. Developed by BRP Seine BESS LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0140, with a queue entry date of December 3, 2020.
The proposed commercial operation date for the Seine BESS project is December 1, 2027. Its interconnection status is currently in the Facility Study phase, and its point of interconnection is the 60500 Edith Clarke 345kV. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Foard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BRP Seine BESS LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
60500 Edith Clarke 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- FOARDCTY_ALL
- POI Substation
- Edith Clarke Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.