Sigma Storage (ERCOT-23INR0126) — Project Summary

Queue ID
ERCOT-23INR0126
Capacity
408.4 MW
Technology
Battery
Status
active
Location
Harris, TX
Region
ERCOT
Developer
AES Distributed Energy, Inc
IA Status
Facility Study

Sigma Storage

ERCOT-23INR0126BetaActiveBatteryERCOTLBNL + Live

408.4 MW storage in Harris, TX · In queue since May 2021 · Proposed COD October 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

408.4 MW

Capacity

1

Components

Battery

5y 6m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 5m

Facilities Study50%
Queue EntryMay 11, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-10-01

Queue history
23INR0126 · 56 monthly ERCOT reports, Feb 2022 – Sep 2026

Projected COD moved

2 times

Dec 2024 → Oct 2029

Net change

+58 months

first report to latest

Capacity

408 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 11, 2021

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 1, 2029
From queue filing
Developer in saved assessment
AES Distributed Energy, Inc
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. Aggregators (ercotqueue.com, Quicksand Check) label it 'Construction' but no news or permit source corroborates this.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/23INR0126/sigma-storage
  2. quicksandcheck.com/texas/harris-county/
  3. ercotqueue.com/project/23INR0126
  4. interconnection.fyi/projects/state/TX/harris-county

Commercial operation date: Only the LBNL/ERCOT filing date (2029-10-01) exists. Aggregators such as Cleanview ('expected to come online in October 2029') repeat the same date and are not independent developer or press confirmation.

Developer: The LBNL filing names AES Distributed Energy, Inc, which is an operating AES subsidiary rather than a shell LLC. Aggregator sites repeat the name, but no press release or news source independently confirms it.

Status: LBNL shows active status, Facility Study, and no IA date, and a 2029 COD is inconsistent with active construction. The 'under construction' labels come from unverified aggregators. The Van Zandt County moratorium in the news facts concerns a different county and does not apply to this Harris County project.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Sigma Storage project is a proposed 408.4 MW battery storage project located in Harris County, Texas. Developed by AES Distributed Energy, Inc., the project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0126, with a queue entry date of May 11, 2021. The proposed commercial operation date is October 1, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The Sigma Storage project consists entirely of battery storage with a total capacity of 408.4 MW. The point of interconnection is the 40460 Deepwater 138kV. The project has been mentioned in recent news coverage, with three articles categorized as deals and industry news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Harris

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

AES Distributed Energy, Inc

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

40460 Deepwater 138kV

Data Source

LBNL + Live

AgencyVan Zandt County Commissioners CourtKETK.com · 2026-02-12
RulingOrderKETK.com · 2026-02-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-19

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.