Blevins Solar (ERCOT-23INR0118) — Project Summary

Queue ID
ERCOT-23INR0118
Capacity
271.58 MW
Technology
Solar
Status
active
Location
Falls, TX
Region
ERCOT
Developer
Blevins Solar, LLC
IA Status
IA Executed

Blevins Solar

ERCOT-23INR0118BetaActiveSolarERCOTLBNL

271.58 MW generation in Falls, TX · In queue since February 2021 · Proposed COD February 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

271.58 MW

Capacity

1

Components

Solar

5y 9m

In Queue

IA Executed

IA Phase

Signed Jun 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 4m

IA → COD

2y 8m

Total Duration

2y 4m

Schedule

9 months past proposed COD

Construction75%
Queue EntryFeb 4, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 17, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-02-12

Queue history
23INR0118 · 63 monthly ERCOT reports, Feb 2021 – May 2026

Projected COD moved

9 times

Jun 2023 → May 2026

Net change

+35 months

first report to latest

Capacity

305 → 272 MW

changed in the reports

Latest stage

Commercial operation

last listed May 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 4, 2021
Facilities study approvedJun 24, 2024
Interconnection agreement signedJun 17, 2023
Approved for energizationMar 11, 2025
Approved for synchronizationMar 24, 2025
Approved for commercial operationJun 12, 2026
On ERCOT's inactive listJul 2025 – Jul 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achievedPR Newswire · 2026-04-04

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Apr 2026
Differs from queue: Feb 12, 2026
Developer in saved assessment
Geronimo Power
Ownership change in saved research
Status at research time
Online
Online — commercial operations began April 2026, delivering power under PPAs to Bristol Myers Squibb and Fujifilm
Financing
Secured
Financing secured (amount undisclosed) — project completed construction and reached COD April 2026 with PPAs to Bristol Myers Squibb and Fujifilm
Ownership history
  1. —·National Grid Renewables→Geronimo Powerprnewswire.com

Milestones in this assessment

IA executedJun 17, 2023

Interconnection Agreement executed with ERCOT

pv-tech.org
GroundbreakingSep 2024

Construction begins with Mortenson as EPC contractor

mortenson.com
COD targetApr 2026Latest in this assessment

Commercial operations achieved — 270 MW solar + 360 MWh storage online

solarpowerworldonline.com
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. solarpowerworldonline.com/2026/04/270-mw-blevins-solar-project-comes-online-in-texas/
  2. prnewswire.com/news-releases/geronimo-power-announces-start-of-operations-at-blevins-solar-302748243.html
  3. pv-tech.org/geronimo-power-brings-270mw-texas-solar-plant-online/
  4. mortenson.com/news-insights/blevins-solar-project-begins-construction-in-texas
  5. pv-tech.org/national-grid-renewables-signs-ppas-for-270mw-blevins-solar-project-in-texas/

Commercial operation date: Multiple independent sources (Solar Power World, PV Tech, PR Newswire, Geronimo Power) confirm commercial operations began in April 2026, matching LBNL's proposed COD of May 2026 within 1 month.

Developer: LBNL filing shows 'Blevins Solar, LLC' (shell entity). News from 2023 identified National Grid Renewables as developer. April 2026 operational announcements consistently name Geronimo Power as owner/operator, indicating acquisition between 2023-2026.

Status: Multiple April 2026 press releases and trade publications confirm the project achieved commercial operations, superseding LBNL's 'Active' queue status.

Project lifecycle
as of 2023-11-21
PhaseConstructionPV Tech · 2023-11-21
OperationalNoPV Tech · 2023-11-21
TechnologySolarPV Tech · 2023-11-21
DeveloperNational Grid RenewablesPV Tech · 2023-11-21
PPA offtakerBristol Myers Squibb, FujifilmPV Tech · 2023-11-21

About

Saved background

Generated Apr 10, 2026 · Predates May 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Blevins Solar is a proposed solar generation project located in Falls County, Texas, within the ERCOT region. The project, developed by Blevins Solar, LLC, has a total capacity of 271.58 MW. It consists entirely of solar photovoltaic generation.

The project entered the ERCOT interconnection queue as entry 23INR0118 on February 4, 2021, with a proposed commercial operation date of March 6, 2026. An Interconnection Agreement (IA) was executed on June 17, 2023. The project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: May 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Falls

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blevins Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap Bellfalls Switch (3404) – Lake Creek Switch (3409)

Data Source

LBNL

DeveloperNational Grid Renewables±PV Tech · 2023-11-21
TransactionPPA±PV Tech · 2023-11-21
Deal value$1.7BS&P Global · 2025-05-22
OfftakerBrookfield Asset Management Ltd.±S&P Global · 2025-05-22
PPA structurePhysicalPV Tech · 2023-11-21
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BLVN_RN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.