Alila Solar (ERCOT-23INR0093) — Project Summary

Queue ID
ERCOT-23INR0093
Capacity
256.5 MW
Technology
Solar+Battery
Status
suspended
Location
San Patricio, TX
Region
ERCOT
Developer
Electra Energy Project, LLC
IA Status
IA Executed

Alila Solar

ERCOT-23INR0093BetaSuspendedSolarBatteryERCOTLBNL + Live

256.5 MW hybrid in San Patricio, TX · In queue since October 2020 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

256.5 MW

Capacity

1

Components

Solar

6y 1m

In Queue

IA Executed

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 3m

IA → COD

5y 3m

Total Duration

2y 3m

Suspended75%
Queue EntryOct 7, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJan 3, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

Construction

Construction pending

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-04-20

Queue history
23INR0093 · 66 monthly ERCOT reports, Sep 2020 – Feb 2026

Projected COD moved

5 times

May 2023 → Apr 2028

Net change

+59 months

first report to latest

Capacity

257 MW

unchanged in the reports

Latest stage

IA signed

last listed Feb 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 7, 2020
Facilities study approvedMar 16, 2023
Interconnection agreement signedJan 3, 2023
On ERCOT's inactive listMar 2026 – Sep 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
May 2027
Differs from queue: Apr 20, 2028
Developer in saved assessment
Electra Energy Project, LLC
From queue filing
Status at research time
Active
Active — IA executed January 2023, financial commitment secured, listed in ERCOT MORA February 2026 with Notice to Proceed
Financing
Secured
Financial commitment confirmed per ERCOT MORA December 2025 listing; specific amount and lead not disclosed in public sources

Milestones in this assessment

IA executedJan 3, 2023

ERCOT Standard Generation Interconnection Agreement executed between AEP Texas Inc. and Electra Energy Project, LLC

interchange.puc.texas.gov
COD targetMay 2027Latest in this assessment

Proposed completion date updated from May 2026 to May 2027

interconnectionfyi.substack.com
Research sources and reasoning (4 recorded sources)

high confidence at research time

  1. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-ad5
  2. ercot.com/files/docs/2025/12/05/MORA_February2026.pdf
  3. interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=1542
  4. uh.edu/energy/_docs/_papers-reports/the-future-of-the-electric-grid-in-texas_supplementary-material_uh.pdf

Commercial operation date: LBNL proposed COD of April 2028 appears stale. Interconnection.fyi weekly update from April 2025 reports proposed completion changed from May 2026 to May 2027, and ERCOT's December 2025 MORA document lists the project with executed SGIA and financial commitment, suggesting active near-term development targeting 2027.

Developer: All sources consistently reference Electra Energy Project, LLC as the developer with no evidence of a parent company or shell-LLC structure. No ownership changes or acquisitions found in search results.

Status: LBNL shows IA executed status from January 2023. ERCOT's December 2025 MORA document confirms the project has executed SGIA, financial commitment, and Notice to Proceed, indicating active development toward 2027 COD.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Alila Solar (ERCOT queue ID 23INR0093) is a proposed hybrid solar and battery storage development project in San Patricio County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Electra Energy Project, LLC and has a total listed capacity of 256.5 MW. The queue data identifies both solar and battery technologies, but the only component with a reported capacity is the 256.5 MW solar portion. No separate capacity is given for the battery storage element. The project's proposed point of interconnection is the 8249 Angstrom 345 kV substation.

The project entered the ERCOT interconnection queue on October 7, 2020. An interconnection agreement (IA) was executed on January 3, 2023. Its proposed commercial operation date is April 20, 2028. Despite the executed agreement, the project's current queue status is listed as suspended.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Feb 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

San Patricio

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Electra Energy Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8249 Angstrom 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
POI Substation
Angstrom Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.