Cascade Solar (ERCOT-23INR0091) — Project Summary

Queue ID
ERCOT-23INR0091
Capacity
171 MW
Technology
Solar
Status
active
Location
Brazoria, TX
Region
ERCOT
Developer
—
IA Status
—

Cascade Solar

ERCOT-23INR0091BetaActiveSolarERCOTLBNL + Live

171 MW generation in Brazoria, TX · In queue since February 2021 · Proposed COD January 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

171 MW

Capacity

1

Components

Solar

5y 9m

In Queue

—

IA Status

Signed Apr 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 2m

IA → COD

4y 9m

Total Duration

2y 2m

Construction0%
Queue EntryFeb 8, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 17, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-01-15

Queue history
23INR0091 · 63 monthly ERCOT reports, May 2021 – Sep 2026

Projected COD moved

10 times

Jun 2023 → Jan 2028

Net change

+55 months

first report to latest

Capacity

250 → 171 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 9, 2021
Facilities study approvedSep 2, 2025
Interconnection agreement signedApr 17, 2023
On ERCOT's inactive listDec 2025 – Jan 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Mar 2019
Differs from queue: Jan 15, 2028
Developer in saved assessment
Cypress Creek Renewables
Filed as Cascade Solar Energy LLC
Status at research time
Active
Active — LBNL queue entry appears to reference a separate 171MW project in Brazoria County, while an existing 10MW Cascade Solar facility operated by Cypress Creek has been online in Wharton County since 2019
Financing
Not recorded

Milestones in this assessment

IA executedApr 17, 2023Latest in this assessment

Interconnection agreement executed per LBNL queue data

interconnection.fyi
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. gem.wiki/Cascade_Solar_TX
  2. comptroller.texas.gov/economy/development/prop-tax/ch313/agreement-docs-details.php?id=1766
  3. cleanview.co/solar-farms/texas/61875/cascade-solar-tx
  4. interconnection.fyi/project/ercot-23inr0091
  5. power-technology.com/data-insights/power-plant-profile-cascade-solar-pv-park-1-us/
  6. gridinfo.com/plant/cascade-solar-tx/61875

Commercial operation date: Multiple independent sources (Cleanview, GridInfo, Power-Technology) confirm Cascade Solar is already operational since March/April 2019 with 10MW capacity in Wharton County. LBNL's 2028 COD and 171MW capacity appear to reference a different project or expansion with the same name in Brazoria County.

Developer: Texas Comptroller records show 'Cascade Solar Energy LLC' as the legal entity for tax incentive application (Ch313 agreement). Cleanview confirms Cypress Creek Renewables as the operator of the existing 10MW Cascade Solar facility in Wharton.

Status: LBNL status 'active' is accurate for queue position. However, research reveals potential naming confusion: an operational 10MW facility exists in Wharton County (different from LBNL's 171MW Brazoria County project). The 171MW project remains in development with 2028 target.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Cascade Solar is a proposed 175 MW solar generation project located in Brazoria County, Texas. The project, developed by Cascade Solar Energy, LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0091. It entered the interconnection queue on February 9, 2021, with a proposed commercial operation date of September 1, 2026.

The project's Interconnection Agreement (IA) has been executed as of April 17, 2023. The point of interconnection is the 345kV Oasis (43035) _x0013_ Seabreeze (43020) circuit 27.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Brazoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ERCOT

Service Type

—

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.