Lavaca Bay Solar (ERCOT-23INR0084) — Project Summary

Queue ID
ERCOT-23INR0084
Capacity
243.46 MW
Technology
Solar
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
Lavaca Bay Solar Project, LLC
IA Status
IA Executed

Lavaca Bay Solar

ERCOT-23INR0084BetaActiveSolarERCOTLBNL

243.46 MW generation in Matagorda, TX · In queue since September 2020 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

243.46 MW

Capacity

1

Components

Solar

6y 2m

In Queue

IA Executed

IA Phase

Signed Jun 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 9m

IA → COD

4y 6m

Total Duration

1y 9m

Construction75%
Queue EntrySep 11, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 15, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-12-31

Queue history
23INR0084 · 59 monthly ERCOT reports, Mar 2021 – Feb 2026

Projected COD moved

2 times

Aug 2023 → Dec 2026

Net change

+40 months

first report to latest

Capacity

240 → 243 MW

changed in the reports

Latest stage

Cancelled

last listed Feb 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 11, 2020
Facilities study approvedMar 21, 2022
Interconnection agreement signedJun 15, 2022
CancelledMar 31, 2026
On ERCOT's inactive listAug 2022 – Aug 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2026
From queue filing
Developer in saved assessment
TC Energy
Ownership change in saved research
Status at research time
Active
Active — IA executed June 2022, project sold to TC Energy in Feb 2024, no construction timeline announced post-acquisition
Financing
Not recorded
Ownership history
  1. 2024-02·NorthRenew Energy→TC Energy Solar LLClinkedin.com

Milestones in this assessment

Permit approvedDec 6, 2021

Van Vleck ISD approved 24,000-acre reinvestment zone and tax value limitation agreement

baycitysentinel.com
IA executedJun 15, 2022

SGIA amendment provisions filed with ERCOT and CenterPoint Energy Houston Electric

interchange.puc.texas.gov
Ownership changeFeb 2024Latest in this assessment

NorthRenew Energy sold 300 MW Lavaca Bay Solar project to major midstream energy company (TC Energy)

linkedin.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. linkedin.com/posts/solarquarter_northrenew-energy-sells-lavaca-bay-solar-activity-7166318698847236096-VPeU
  2. renewablesinfo.org/project/ercot-23inr0084-lavaca-bay-solar
  3. baycitysentinel.com/news-lifestyle/vvisd-approves-24000-acre-solar-farm-313-agreement-jessica-shepard
  4. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=FilingParty&SortOrder=Ascending
  5. northrenew.com/northrenew-sells-its-300-mw-lavaca-bay-solar-project/

Commercial operation date: LBNL queue shows 2026-12-31 COD with IA executed in 2022. No recent news confirms or updates this target; project appears to have been sold by NorthRenew to a midstream energy company (per 2024 announcement), but no post-sale COD timeline has been published.

Developer: LBNL filing entity is 'Lavaca Bay Solar Project, LLC' (shell LLC). NorthRenew Energy announced sale of the project in Feb 2024 to 'a major midstream energy company.' Renewablesinfo.org identifies current developer as 'TC Energy Solar LLC,' consistent with TC Energy being a major midstream player acquiring solar assets.

Status: LBNL shows 'active' status with IA executed. One third-party source (interconnection.fyi) claims 'withdrawn,' but this contradicts LBNL's authoritative queue data and the 2024 sale announcement, suggesting that site may be outdated or erroneous.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lavaca Bay Solar is a proposed 243.46 MW solar generation project located in Matagorda County, Texas. The project, being developed by TC Energy Solar LLC, is interconnected within the ERCOT region under queue ID ERCOT-23INR0084. It entered the interconnection queue on September 11, 2020, and has a proposed commercial operation date of December 31, 2026.

The project's Interconnection Agreement (IA) has been executed as of June 15, 2022. The point of interconnection (POI) is the tap 345 kV REFUGE 42400 - JONES CREEK 47532 ckt 27. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Feb 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Lavaca Bay Solar Project, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345 kV REFUGE 42400 - JONES CREEK 47532 ckt 27

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.