Duffy Solar (ERCOT-23INR0057) — Project Summary

Queue ID
ERCOT-23INR0057
Capacity
502.46 MW
Technology
Solar+Battery
Status
active
Location
Matagorda, TX
Region
ERCOT
Developer
VDA Solar Texas 1 LLC
IA Status
IA Executed

Duffy Solar

ERCOT-23INR0057BetaActiveSolarBatteryERCOTLBNL + Live

502.46 MW hybrid in Matagorda, TX · In queue since September 2020 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

502.46 MW

Capacity

1

Components

Solar

5y 10m

In Queue

IA Executed

IA Phase

Signed Apr 2023

Interconnection

Queue → IA

2y 7m

IA → COD

4y 8m

Total Duration

2y 7m

Construction75%
Queue EntrySep 11, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementApr 12, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-31

Cross-source intelligence
Beta
High confidence·8 sources·as of 2026-06-01
Expected COD
2027
From queue filing
Developer
Linea Energy
Recent ownership change
Status
Active
Active — IA executed April 2023, construction starting Q3 2026 per May 2026 announcement, 500 MW PPA with Google secured
Financing
Secured
500 MW, 15-year PPA with Google announced May 2026; February 2026 equity financing secured for co-located 235 MW battery storage
Ownership history
  1. 2023-06·Horus EnergyLinea Energysource
Key milestones
IA executedApr 12, 2023

ERCOT Standard Generation Interconnection Agreement executed between CenterPoint Energy Houston Electric and VDA Solar Texas 1 LLC

source
Ownership changeJun 2023

Linea Energy acquires 490MW Duffy Solar project from Horus Energy

source
Groundbreaking2026

Construction scheduled to begin Q3 2026

source
Financing closeFeb 2026

Linea Energy secures equity financing for co-located 235 MW Duffy BESS, teeing up solar project

source
Financing closeMay 2026Most recent

Linea Energy and Google sign 15-year, 500 MW PPA for Duffy Solar Project

source
About

Duffy Solar is a proposed 502.46 MW solar generation project located in Matagorda County, Texas. The developer is VDA Solar Texas 1 LLC. The project is interconnected within the Electric Reliability Council of Texas (ERCOT) queue as entry ERCOT-23INR0057, with a queue entry date of September 11, 2020. The proposed commercial operation date is December 31, 2027.

The project's Interconnection Agreement (IA) was executed on April 12, 2023. The point of interconnection is Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39). The Duffy Solar project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Matagorda

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

VDA Solar Texas 1 LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV WAP to STP CKT39 (PTI# 5915-44000 CKT 39)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.