Scarlet Solar (ERCOT-23INR0015) — Project Summary

Queue ID
ERCOT-23INR0015
Capacity
180 MW
Technology
Solar
Status
active
Location
Castro, TX
Region
ERCOT
Developer
Innovative Solar 416, LLC
IA Status
Facility Study

Scarlet Solar

ERCOT-23INR0015BetaActiveSolarERCOTLBNL + Live

180 MW generation in Castro, TX · In queue since December 2019 · Proposed COD August 2025

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

180 MW

Capacity

1

Components

Solar

6y 11m

In Queue

Facility Study

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Schedule

15 months past proposed COD

Facilities Study50%
Queue EntryDec 11, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-08-26

Queue history
23INR0015 · 74 monthly ERCOT reports, Aug 2020 – Sep 2026

Projected COD moved

2 times

Apr 2023 → Aug 2025

Net change

+28 months

first report to latest

Capacity

180 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 11, 2019

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — Facility Study stage per LBNL queue, no public development activity found in recent news or web sources
Financing
Not recorded
Research sources and reasoning (7 recorded sources)

low confidence at research time

  1. edp.com/en/north-america/na/media/edp-renewables-north-america-unveils-200-mw-solar-and-150-mw-energy-storage
  2. powermag.com/edp-renewables-brings-second-phase-of-california-solar-farm-online/
  3. thebusinessjournal.com/solar-park-sees-phase-2-debut-in-fresno-county/
  4. pv-tech.org/us-round-up-edpr-na-desri-scale-solar-projects-microsoft-backs-nexamps-300mw-clean-energy-rollout/
  5. edp.com/en/north-america/na/projects/scarlet-solar-energy-park
  6. fresnocountyca.gov/Departments/Public-Works-and-Planning/divisions-of-public-works-and-planning/development-services-division/planning-and-land-use/environmental-impact-reports/scarlet-solar
  7. gridinfo.com/plant/scarlet-ii-hybrid/66951

Commercial operation date: LBNL shows 2025-08-26 COD for 'Scarlet Solar' 180MW in Castro County, TX. However, all search results point to EDP Renewables' 'Scarlet Solar Energy Park' in Fresno County, CA (Scarlet I operational July 2024, Scarlet II operational May 2025). These are different projects with the same name in different states. No evidence found for the TX Castro County project.

Developer: LBNL lists 'Innovative Solar 416, LLC' as developer for the TX project. All search results reference EDP Renewables' California projects. No connection found between Innovative Solar 416 and the TX Castro County project in available sources.

Status: LBNL queue status is 'active' at Facility Study stage. However, complete absence of any news, press releases, or web mentions for this specific TX project suggests it may be dormant despite queue status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Scarlet Solar is a proposed 180 MW solar generation project located in Castro County, Texas. The developer is Innovative Solar 416, LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0015, with a queue entry date of December 11, 2019, and a proposed commercial operation date of August 26, 2025. Its interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is the tap 345kV 23912 Ogallala - 23910 Windmill. The project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Castro

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Innovative Solar 416, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 23912 Ogallala - 23910 Windmill

Data Source

LBNL + Live

DeveloperEDP Renewables North America LLCEDP Global · 2025-01-07
TransactionPPAEDP Global · 2025-01-07
OfftakerRedwood Coast Energy AuthorityEDP Global · 2025-01-07
PPA structurePhysicalEDP Global · 2025-01-07
PPA term15 yearsEDP Global · 2025-01-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Ogallala Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.