Platinum Storage
309.53 MW storage in Fannin, TX · In queue since September 2021 · Proposed COD February 2026
309.53 MW
Capacity
1
Components
Battery
5y 2m
In Queue
IA Executed
IA Phase
Signed Nov 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
1y 2m
IA → COD
3y 3m
Total Duration
1y 2m
Schedule
9 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2026-02-26
Projected COD moved
11 times
Dec 2022 → Feb 2026
Net change
+38 months
first report to latest
Capacity
304 → 310 MW
changed in the reports
Latest stage
Commercial operation
last listed Jan 2026
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-22inr0554
- askthegrid.com/assets/facilities/platinum-storage
- ercot.com/files/docs/2025/09/02/Stand-Alone-Generation-Resources-as-of-09.01.25-v2.pdf
- interchange.puc.texas.gov/Documents/53385_2600_1454590.PDF
- panethos.wordpress.com/2026/10/08/largest-standalone-utility-scale-battery-energy-storage-system-bess-sites-in-the-usa/
- instagram.com/reel/DaHYrh3jbp4/
Commercial operation date: No post-LBNL source gives a different date. A 2026 list (panethos) shows "Platinum Storage (2026): Fanin County, TX = 348 megawatts", which fits the LBNL proposed COD of 2026-02-26. The exact day comes only from LBNL.
Developer: No search result names a parent or operating company for the battery project. The platinumenergystorage.com site (tank terminals) and Platinum Storage Group (self-storage) are unrelated businesses with similar names. I used the LBNL filing entity as-is.
Status: LBNL shows an active queue entry with an executed IA and is_operational=false. Secondary sources conflict on construction versus operating, and none is an authoritative dated confirmation, so I kept the LBNL status.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Platinum Storage is a proposed 309.53 MW battery storage project in Fannin County, Texas. Developed by Platinum Energy Storage LLC, the project consists entirely of battery storage. It is interconnected within the ERCOT region under queue ID ERCOT-22INR0554, with an interconnection queue entry date of September 2, 2021. The proposed commercial operation date is June 15, 2025, and the Interconnection Agreement (IA) was executed on November 17, 2022.
The project is linked to the existing Platinum Storage operating plant (EIA plant ID 69044).
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
- Queue history observations through: Jan 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Fannin
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Platinum Energy Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
1729 Valley South 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- PLATINUM_RN
- POI Substation
- Valley South Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Queue projects in Texas
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.