Platinum Storage (ERCOT-22INR0554) — Project Summary

Queue ID
ERCOT-22INR0554
Capacity
309.53 MW
Technology
Battery
Status
active
Location
Fannin, TX
Region
ERCOT
Developer
Platinum Energy Storage LLC
IA Status
IA Executed

Platinum Storage

ERCOT-22INR0554BetaActiveBatteryERCOTLBNL

309.53 MW storage in Fannin, TX · In queue since September 2021 · Proposed COD February 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

309.53 MW

Capacity

1

Components

Battery

5y 2m

In Queue

IA Executed

IA Phase

Signed Nov 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 2m

IA → COD

3y 3m

Total Duration

1y 2m

Schedule

9 months past proposed COD

Construction75%
Queue EntrySep 2, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 17, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-02-26

Queue history
22INR0554 · 50 monthly ERCOT reports, Sep 2021 – Jan 2026

Projected COD moved

11 times

Dec 2022 → Feb 2026

Net change

+38 months

first report to latest

Capacity

304 → 310 MW

changed in the reports

Latest stage

Commercial operation

last listed Jan 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 2, 2021
Facilities study approvedJul 31, 2024
Interconnection agreement signedNov 17, 2022
Approved for energizationMay 21, 2025
Approved for synchronizationJun 3, 2025
Approved for commercial operationFeb 26, 2026
On ERCOT's inactive listOct 2022 – Dec 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 26, 2026
From queue filing
Developer in saved assessment
Platinum Energy Storage LLC
From queue filing
Status at research time
Active
Active, IA executed (2022-11-17). The project appears to be at or near commissioning: it is on the ERCOT stand-alone resource list as of 09/2025, one aggregator post says under construction, and interconnection.fyi's snippet says operational. These signals conflict, so full operation is not confirmed.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-22inr0554
  2. askthegrid.com/assets/facilities/platinum-storage
  3. ercot.com/files/docs/2025/09/02/Stand-Alone-Generation-Resources-as-of-09.01.25-v2.pdf
  4. interchange.puc.texas.gov/Documents/53385_2600_1454590.PDF
  5. panethos.wordpress.com/2026/10/08/largest-standalone-utility-scale-battery-energy-storage-system-bess-sites-in-the-usa/
  6. instagram.com/reel/DaHYrh3jbp4/

Commercial operation date: No post-LBNL source gives a different date. A 2026 list (panethos) shows "Platinum Storage (2026): Fanin County, TX = 348 megawatts", which fits the LBNL proposed COD of 2026-02-26. The exact day comes only from LBNL.

Developer: No search result names a parent or operating company for the battery project. The platinumenergystorage.com site (tank terminals) and Platinum Storage Group (self-storage) are unrelated businesses with similar names. I used the LBNL filing entity as-is.

Status: LBNL shows an active queue entry with an executed IA and is_operational=false. Secondary sources conflict on construction versus operating, and none is an authoritative dated confirmation, so I kept the LBNL status.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Platinum Storage is a proposed 309.53 MW battery storage project in Fannin County, Texas. Developed by Platinum Energy Storage LLC, the project consists entirely of battery storage. It is interconnected within the ERCOT region under queue ID ERCOT-22INR0554, with an interconnection queue entry date of September 2, 2021. The proposed commercial operation date is June 15, 2025, and the Interconnection Agreement (IA) was executed on November 17, 2022.

The project is linked to the existing Platinum Storage operating plant (EIA plant ID 69044).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Jan 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Fannin

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Platinum Energy Storage LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1729 Valley South 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH
Nearest Node (Estimated)
PLATINUM_RN
POI Substation
Valley South Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.