Bird Dog Energy Storage (ERCOT-22INR0467) — Project Summary

Queue ID
ERCOT-22INR0467
Capacity
60.4 MW
Technology
Battery
Status
active
Location
Live Oak, TX
Region
ERCOT
Developer
VESI 37 LLC
IA Status
IA Executed

Bird Dog Energy Storage

ERCOT-22INR0467BetaActiveBatteryERCOTLBNL + Live

60.4 MW storage in Live Oak, TX · In queue since February 2021 · Proposed COD October 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

60.4 MW

Capacity

1

Components

Battery

5y 9m

In Queue

IA Executed

IA Phase

Signed Feb 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 years

IA → COD

2y 8m

Total Duration

3 years

Schedule

1 months past proposed COD

Construction75%
Queue EntryFeb 4, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 16, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-10-23

Queue history
22INR0467 · 53 monthly ERCOT reports, May 2022 – Sep 2026

Projected COD moved

8 times

Aug 2024 → Oct 2026

Net change

+26 months

first report to latest

Capacity

60 → 60 MW

changed in the reports

Latest stage

Synchronized

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 4, 2021
Facilities study approvedJun 18, 2025
Interconnection agreement signedFeb 16, 2024
Approved for energizationAug 5, 2026
Approved for synchronizationAug 28, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bird Dog BESS is a proposed 60.4 MW battery storage project in Live Oak County, Texas. Developed by VESI 37 LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-22INR0467. The project entered the interconnection queue on February 4, 2021, and has a proposed commercial operation date of June 30, 2026.

The interconnection agreement for Bird Dog BESS was executed on February 16, 2024. The point of interconnection is the 5668 Mathis 69kV. The project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Live Oak

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

VESI 37 LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

5669 Argenta 69kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.