Pajarita BESS (ERCOT-22INR0466) — Project Summary

Queue ID
ERCOT-22INR0466
Capacity
205.5 MW
Technology
Battery
Status
active
Location
Cameron, TX
Region
ERCOT
Developer
VESI 29 LLC
IA Status
IA Executed

Pajarita BESS

ERCOT-22INR0466BetaActiveBatteryERCOTLBNL

205.5 MW storage in Cameron, TX · In queue since January 2021 · Proposed COD July 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.5 MW

Capacity

1

Components

Battery

5y 10m

In Queue

IA Executed

IA Phase

Signed Jun 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 5m

IA → COD

3y 1m

Total Duration

4y 5m

Construction75%
Queue EntryJan 25, 2021

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementJun 19, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-07-19

Queue history
22INR0466 · 53 monthly ERCOT reports, Dec 2021 – Apr 2026

Projected COD moved

4 times

Oct 2023 → Jul 2028

Net change

+57 months

first report to latest

Capacity

206 MW

unchanged in the reports

Latest stage

Cancelled

last listed Apr 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 25, 2021
Interconnection agreement signedJun 19, 2025
CancelledMay 28, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jul 19, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
IA Executed
IA Executed — interconnection agreement with AEP Texas signed 6/19/2025, facility study pending per ERCOT queue tracker
Financing
Not recorded

Milestones in this assessment

IA executedJun 19, 2025

Generation Interconnection Agreement with AEP Texas filed with FERC, effective 6/19/2025

public-inspection.federalregister.gov
COD targetJul 19, 2028Latest in this assessment

ERCOT capacity charts list 2028 commercial operation target

ercot.com
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. public-inspection.federalregister.gov/2025-12653.pdf?1751892314
  2. ercot.com/files/docs/2025/12/04/Capacity-Changes-by-Fuel-Type-Charts_November_2025.xlsx
  3. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  4. modo-content-service-prod.s3.amazonaws.com/media/reports/2024/05/22/ERCOT_BESS_buildout_report_May_2024_YwMZT0X.xlsx

Commercial operation date: LBNL queue shows 2028-07-19 COD. ERCOT capacity charts (Nov 2025) confirm 2028 target. No contradictory developer announcements found.

Developer: VESI 29 LLC appears to be a project-specific SPV. No press releases or corporate announcements found identifying the parent operating company. All public filings reference only the LLC entity.

Status: LBNL shows IA executed 2025-06-19. Texas PUC filings confirm FERC 205(d) rate filing for AEP Texas-VESI 29 interconnection agreement effective 6/19/2025. ERCOT queue shows FIS (Facility Interconnection Study) pending.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Pajarita BESS project is a proposed 205.5 MW battery storage project located in Cameron County, Texas. The developer is VESI 29 LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-22INR0466, with a queue entry date of January 25, 2021. The proposed commercial operation date is July 19, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists entirely of battery storage with a total capacity of 205.5 MW. The point of interconnection is the 8266 Marconi 138kV location. The Pajarita BESS project has appeared in recent news coverage regarding energy storage development in Texas.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
  • Queue history observations through: Apr 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Cameron

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

VESI 29 LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8266 Marconi 138kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
RN_SR_WIND1
POI Substation
Marconi Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.