Blue Sky Sol (ERCOT-22INR0455) — Project Summary

Queue ID
ERCOT-22INR0455
Capacity
101.2 MW
Technology
Solar+Battery
Status
active
Location
Crockett, TX
Region
ERCOT
Developer
Blue Sky Solar LLC
IA Status
IA Executed

Blue Sky Sol

ERCOT-22INR0455BetaActiveSolarBatteryERCOTLBNL + Live

101.2 MW hybrid in Crockett, TX · In queue since December 2020 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

101.2 MW

Capacity

1

Components

Solar

5y 11m

In Queue

IA Executed

IA Phase

Signed Feb 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 2m

IA → COD

5y 10m

Total Duration

1y 2m

Construction75%
Queue EntryDec 3, 2020

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementFeb 1, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-31

Queue history
22INR0455 · 70 monthly ERCOT reports, Dec 2020 – Sep 2026

Projected COD moved

5 times

Dec 2022 → Dec 2027

Net change

+60 months

first report to latest

Capacity

101 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 3, 2020
Facilities study approvedJul 5, 2023
Interconnection agreement signedFeb 1, 2022

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Apr 22, 2027
Differs from queue: Dec 31, 2027
Developer in saved assessment
Blue Sky Solar LLC
From queue filing
Status at research time
Active
Active — IA executed Feb 2022, COD target updated to April 2027
Financing
Not recorded

Milestones in this assessment

IA executedFeb 1, 2022

Interconnection Agreement executed with AEP TEXAS INC

eta-publications.lbl.gov
COD targetApr 22, 2027Latest in this assessment

Proposed completion date updated from February 2025 to April 22, 2027

interconnectionfyi.substack.com
Research sources and reasoning (5 recorded sources)

medium confidence at research time

  1. cleanview.co/planned-solar-projects/TX/22INR0455/blue-sky-sol
  2. interconnection.fyi/project/ercot-22inr0455
  3. eta-publications.lbl.gov/sites/default/files/2024-09/hybrid_plant_tracking_2024_data_workbook.xlsx
  4. interconnectionfyi.substack.com/p/interconnection-weekly-project-updates-442
  5. cpsenergy.com/content/dam/corporate/en/Documents/Infrastructure/ranchtown-to-talley-road-/Need_110524_ADA.pdf

Commercial operation date: LBNL proposed COD was 2027-12-31, but Interconnection Weekly (Feb 2025) reports the proposed completion changed from Feb 2025 to April 22, 2027, indicating a more current target date from ERCOT filings.

Developer: All sources consistently identify Blue Sky Solar LLC as the developer. No parent company or operating entity distinct from the filing LLC was found in any research.

Status: LBNL shows active status with IA executed in Feb 2022. Recent interconnection tracking (Feb 2025) confirms project remains in queue with updated completion timeline.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Blue Sky Sol is a proposed solar generation project with a total capacity of 101.2 MW, located in Crockett County, Texas. The developer is Blue Sky Solar LLC. The project is in the ERCOT interconnection queue as entry ERCOT-22INR0455, with a queue entry date of December 3, 2020. The proposed commercial operation date is April 23, 2027.

The project's interconnection agreement (IA) has been executed as of February 1, 2022. The point of interconnection (POI) is the 6562 Friends Ranch 138kV substation. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Crockett

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Blue Sky Solar LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

6562 Friends Ranch 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.