Frye Storage (ERCOT-22INR0402) — Project Summary

Queue ID
ERCOT-22INR0402
Capacity
503.85 MW
Technology
Solar+Battery
Status
active
Location
Swisher, TX
Region
ERCOT
Developer
Hecate Energy Frye Storage LLC
IA Status
Facility Study

Frye Storage

ERCOT-22INR0402BetaActiveBatteryBatteryERCOTLBNL + Live

503.85 MW generation in Swisher, TX · In queue since September 2020 · Proposed COD December 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

503.85 MW

Capacity

1

Components

Battery

5y 10m

In Queue

Facility Study

IA Phase

COD target: 2028

Interconnection

Total Duration

8y 3m

Facilities Study50%
Queue EntrySep 2, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Cross-source intelligence
Beta
Low confidence·3 sources·as of 2026-06-01
Expected COD
Dec 2028
From queue filing
Developer
Hecate Energy
Filed as Hecate Energy Frye Storage LLC
Status
Active
Active — In Development per Hecate Energy project page, Facility Study stage in ERCOT queue
Financing
Unannounced
About

The Frye Storage project is a proposed 503.85 MW battery storage project located in Swisher County, Texas. Developed by Hecate Energy Frye Storage LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-22INR0402, with a queue entry date of September 2, 2020, and a proposed commercial operation date of December 1, 2028. The project's interconnection status is currently in the Facility Study phase.

The proposed project would connect to a new 345kV substation, Kress, linking both the 23912 Ogallala and 23914 Tule Canyon circuits. The Frye Storage project has been mentioned in recent news articles.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Swisher

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy Frye Storage LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

new 345kV sub Kress connecting both 23912 Ogallala - 23914 Tule Canyon circuits

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.