Frye Storage
503.85 MW generation in Swisher, TX · In queue since September 2020 · Proposed COD December 2028
503.85 MW
Capacity
1
Components
Battery
6y 2m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
Projected COD moved
6 times
Aug 2022 → Dec 2028
Net change
+76 months
first report to latest
Capacity
500 → 504 MW
changed in the reports
Latest stage
Facilities study done
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- hecateenergy.com/projects/
- cleanview.co/power-projects/planned/battery-storage-projects/texas/22INR0402/frye-storage
- ercotqueue.com/project/22INR0402
- interconnection.fyi/project/ercot-22inr0402
Commercial operation date: Only the LBNL proposed COD of 2028-12-01 exists. Cleanview's 'Expected online 2028' appears to be derived from the queue data, so it is not an independent signal. No developer press release or financing-backed target was found for the storage project.
Developer: Hecate Energy's own projects page lists Frye Storage (TX, ~500 MW, storage) as 'In Development', so the LBNL project LLC maps to Hecate Energy. The Repsol/Stonepeak transactions concern the separate, operating Frye Solar project, and nothing ties them to the storage project, so no ownership change is recorded.
Status: LBNL, interconnection.fyi, ercotqueue.com and Hecate's projects page all show the project as active or in development. No withdrawal, construction start or IA execution was found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Frye Storage project is a proposed 503.85 MW battery storage project located in Swisher County, Texas. Developed by Hecate Energy Frye Storage LLC, the project consists entirely of battery storage. It is currently active in the ERCOT interconnection queue as entry ERCOT-22INR0402, with a queue entry date of September 2, 2020, and a proposed commercial operation date of December 1, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project would connect to a new 345kV substation, Kress, linking both the 23912 Ogallala and 23914 Tule Canyon circuits. The Frye Storage project has been mentioned in recent news articles.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Swisher
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Frye Storage LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
new 345kV sub Kress connecting both 23912 Ogallala - 23914 Tule Canyon circuits
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- frye_slr_all
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesObtain a complete list of Hecate Energy's operating assets, including in-service dates, to accurately identify plants added since 2023.
Structured data lookup for Hecate Energy with rankings and aggregations.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.